Skip to content

H2020FP7HORIZONEDF

Ikerlan S. Coop

Country
ESSpain
Defence projects
2
Projects, all programmes
105
As coordinator
17
EU contribution (CORDIS)
EUR 42,385,848
Active
2008 to 2025

Projects

105 projects, newest first

Projects, newest first
ProjectProgrammeYearRoleEU contribution
UltimateGaNResearch for GaN technologies, devices, packages and applications to address the challenges of the future GaN roadmapH20202019ParticipantEUR 350,000
SELENESELENE: Self-monitored Dependable platform for High-Performance Safety-Critical SystemsH20202019ParticipantEUR 524,241
REACTIONfirst and euRopEAn siC eigTh Inches pilOt liNeH20202018ParticipantEUR 304,500
ELASTICA Software Architecture for Extreme-ScaLe Big-Data AnalyticS in Fog CompuTIng ECosystemsH20202018ParticipantEUR 598,125
EMULRADIO4RAILEMULATION OF RADIO ACCESS TECHNOLOGIES FOR RAILWAY COMMUNICATIONSH20202018ParticipantEUR 118,438
ACHILESAdvanced Architectures Chassis/Traction concept for Future Electric vehiclesH20202018ParticipantEUR 302,255
LightAirLight weight airframe structures through combination with high performance materialsH20202018ParticipantEUR 92,220
I3PSIntegration of Innovative Ice Protection SystemsH20202018ParticipantEUR 116,700
SELFIESELF-sustained and Smart Battery Thermal Management SolutIon for Battery Electric VehiclesH20202018ParticipantEUR 299,375
TEST-innTEST-INNOVATIVE LOAD APPLICATION MONITORING SYSTEMSH20202018CoordinatorEUR 230,109
Safe4RAIL-2Safe architecture for Robust distributed Application Integration in roLling stock 2H20202018CoordinatorEUR 985,575
BAMBOOBoosting new Approaches for flexibility Management By Optimizing process Off-gas and waste useH20202018ParticipantEUR 403,504
MegaMaRt2MegaModelling at Runtime - scalable model-based framework for continuous development and runtime validation of complex systems.H20202017ParticipantEUR 168,875
LAY2FORMEfficient Material Hybridization by Unconventional Layup and Forming of Metals and Composites for Fabrication of Multifunctional StructuresH20202017Third partyNot stated
GHOSTInteGrated and PHysically Optimised Battery System for Plug-in Vehicles TechnologiesH20202017ParticipantEUR 482,375
ETEKINAHEAT PIPE TECHNOLOGY FOR THERMAL ENERGY RECOVERY IN INDUSTRIAL APPLICATIONSH20202017CoordinatorEUR 771,000
ASSUREDfASt and Smart charging solutions for full size URban hEavy Duty applicationsH20202017ParticipantEUR 255,956
inSSIghtIn-depth support for innovation and exploitation in Smart Systems IntegrationH20202017ParticipantEUR 110,053
I-MECHIntelligent Motion Control Platform for Smart Mechatronic SystemsH20202017ParticipantEUR 100,188
SAFIRECloud-based Situational Analysis for Factories providing Real-time Reconfiguration ServicesH20202016ParticipantEUR 439,631

The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.

Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.