H2020FP7HORIZONEDF
AIT Austrian Institute of Technology GmbH
- Country
- ATAustria
- Defence projects
- 43
- Projects, all programmes
- 455
- As coordinator
- 85
- EU contribution (CORDIS)
- EUR 200,842,551
- Active
- 2008 to 2026
Projects
455 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| CARONTECreating an Agenda for Research ON Transportation sEcuity | FP7 | 2014 | Participant | EUR 129,957 |
| DRIVER+DRiving InnoVation in crisis management for European Resilience | FP7 | 2014 | Participant | EUR 2,396,760 |
| MOBILEPASSA secure, modular and distributed mobile border control solution for European land border crossing points | FP7 | 2014 | Coordinator | EUR 1,096,080 |
| SUSTAIN EU-ASEANSUSTAIN EU-ASEAN: Sustain and enhance cooperation on sustainable development between Europe and Southeast Asia | FP7 | 2013 | Participant | EUR 21,935 |
| PARISPrivAcy pReserving Infrastructure for Surveillance | FP7 | 2013 | Participant | EUR 478,090 |
| ROSANNEROlling resistance, Skid resistance, ANd Noise Emission measurement standards for road surfaces | FP7 | 2013 | Coordinator | EUR 363,745 |
| ARROWHEADArrowhead | FP7 | 2013 | Participant | EUR 69,467 |
| BOOSTBOOST - Cooperation in Urban Science, Technology and Policy | FP7 | 2013 | Participant | EUR 290,700 |
| WARP-5Coherent Broadband Networks Embedding Smart Photonics for Cost-Effective Quintuple-Play | FP7 | 2013 | Coordinator | EUR 75,000 |
| READY4SmartCitiesICT Roadmap and Data Interoperability for Energy Systems in Smart Cities | FP7 | 2013 | Participant | EUR 54,492 |
| eWALLeWall for Active Long Living | FP7 | 2013 | Participant | EUR 300,381 |
| TRANSFORMTRANSFORMation Agenda for Low Carbon Cities | FP7 | 2013 | Participant | Not stated |
| AEROCEPTORUAV BASED INNOVATIVE MEANS FOR LAND AND SEA NON-COOPERATIVE VEHICLES STOP | FP7 | 2013 | Participant | EUR 317,484 |
| SEISMICSEiSMiC, Societal Engagement in Science, Mutual learning in Cities | FP7 | 2013 | Coordinator | EUR 708,012 |
| COTEVOSConcepts, Capacities and Methods for Testing EV systems and their interOperability within the Smartgrids | FP7 | 2013 | Participant | EUR 635,658 |
| OrPHEuSOPtimising Hybrid Energy grids for smart citieS | FP7 | 2013 | Participant | EUR 427,672 |
| FASTPASSA harmonized, modular reference system for all European automated border crossing points | FP7 | 2013 | Coordinator | EUR 2,758,324 |
| NANOREGA common European approach to the regulatory testing of nanomaterials | FP7 | 2013 | Participant | EUR 40,873 |
| PLANGRIDEVDistribution grid planning and operational principles for EV mass roll-out while enabling DER integration | FP7 | 2013 | Participant | EUR 670,969 |
| ARTSAccelerating and Rescaling Transitions to Sustainability | FP7 | 2013 | Participant | EUR 189,258 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.European Defence Fund participants are read from the project factsheets that DG DEFIS publishes, by a language model; every name is checked against the factsheet text and a name that is not in it is dropped. The factsheets state no amount per participant.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.