H2020FP7HORIZONEDF
Universita Degli Studi di Roma la Sapienza
- Country
- ITItaly
- Defence projects
- 1
- Projects, all programmes
- 557
- As coordinator
- 183
- EU contribution (CORDIS)
- EUR 219,576,634
- Active
- 2008 to 2027
Projects
557 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| MYCOREDNovel integrated strategies for worldwide mycotoxin reduction in the food and feed chains | FP7 | 2009 | Participant | EUR 80,000 |
| SYNER-GSystemic Seismic Vulnerability and Risk Analysis for Buildings, Lifeline Networks and Infrastructures Safety Gain | FP7 | 2009 | Participant | EUR 327,100 |
| DYNOTRAINRailway Vehicle Dynamics and Track Interactions Total Regulatory Acceptance for the Interoperable Network | FP7 | 2009 | Participant | EUR 182,715 |
| CP-ESFRCollaborative Project on European Sodium Fast Reactor | FP7 | 2009 | Participant | EUR 121,416 |
| ECHORDEuropean Clearing House for Open Robotics Development | FP7 | 2009 | Participant | EUR 127,800 |
| MULTISCALECHEMBIOElectronic Structure of Chemical, Biochemical, and Biophysical Systems: Multiscale Approach with Electron Correlation | FP7 | 2009 | Coordinator | EUR 600,000 |
| ULISSEThe USOCs KnowLedge Integration and dissemination for Space Science Experimentation | FP7 | 2009 | Participant | EUR 238,500 |
| NOTCHITNOTCH SIGNALING IN DEVELOPMENT AND PATHOLOGY | FP7 | 2009 | Coordinator | EUR 716,307 |
| MYOAGEUnderstanding and combating human age-related muscle weakness | FP7 | 2009 | Participant | EUR 567,516 |
| AEROTRAINAEROdynamics Total Regulatory Acceptance for the Interoperable Network | FP7 | 2009 | Participant | EUR 92,700 |
| MALVECBLOKPopulation biology and molecular genetics of vectorial capacity in Anopheles gambiae: targeting reproductive behaviour and immunity for transmission-refractory interventions | FP7 | 2009 | Participant | EUR 314,316 |
| PANTOTRAINPANTOgraph and catenary interaction Total Regulatory Acceptance for the Interoperable Network | FP7 | 2009 | Participant | EUR 78,750 |
| SECOASOLUTIONS for ENVIRONMENTAL CONTRASTS in COASTAL AREAS | FP7 | 2009 | Participant | EUR 1,148,256 |
| ARGUS 3DAiR Guidance and Surveillance 3D | FP7 | 2009 | Participant | EUR 417,040 |
| COMPLOIDSPhysics of Complex Colloids: Equilibrium and Driven | FP7 | 2009 | Participant | EUR 415,525 |
| MODERNMOdeling and DEsign of Reliable, process variation-aware Nanoelectronic devices, circuits and systems | FP7 | 2009 | Participant | EUR 56,780 |
| INFRAVECResearch capacity for the implementation of genetic control of mosquitoes | FP7 | 2009 | Participant | EUR 184,929 |
| ATOMAirport detection and Tracking Of dangerous Materials by passive and active sensors arrays | FP7 | 2009 | Participant | EUR 452,780 |
| AEROFASTAEROcapture for Future spAce tranSporTation | FP7 | 2009 | Participant | EUR 139,650 |
| ISP-1In Space Propulsion 1 | FP7 | 2009 | Participant | EUR 367,500 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.European Defence Fund participants are read from the project factsheets that DG DEFIS publishes, by a language model; every name is checked against the factsheet text and a name that is not in it is dropped. The factsheets state no amount per participant.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.