Skip to content

H2020

VIBES

IMPROVING RECYCLABILITY OF THERMOSET COMPOSITE MATERIALS THROUGH A GREENER RECYCLING TECHNOLOGY BASED ON REVERSIBLE BIOBASED BONDING MATERIALS

Programme
Horizon 2020
Started
Ends
Duration
48 months
Total cost
EUR 5,299,800
EU contribution
EUR 4,224,039
Participants
9 from 6 countries
Topic
H2020_BBI-2020-SO2-R3
Grant agreement
101023190

Coordinated by Fundacion Aitiip (ESSpain).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Fundacion AitiipESSpainCoordinatorEUR 758,563PIC (1.00)
Weverij Flipts en Dobbels NVBEBelgiumParticipantEUR 164,700PIC (1.00)
Deutsche Institute Fur Textil- und Faserforschung DenkendorfDEGermanyParticipantEUR 350,750known name (0.95)
Acciona Construccion SAESSpainParticipantEUR 0PIC (1.00)
Bcircular Composites Sociedad LimitadaESSpainParticipantEUR 411,691PIC (1.00)
Consorcio Aerodromo Aeropuerto de TeruelESSpainParticipantEUR 124,400VAT number (0.97)
Specific PolymersFRFranceParticipantEUR 525,497PIC (1.00)
Juno Composites LtdIEIrelandParticipantEUR 135,350PIC (1.00)
Archa SRLITItalyParticipantEUR 246,950PIC (1.00)

Changes of the consortium

First seen on with 9 participants from 6 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.