H2SUSBUILD

Development of a clean and energy self-sustained building in the vision of integrating H2 economy with renewable energy sources

Programme
Seventh Framework Programme
Started
Ends
Duration
48 months
Total cost
EUR 9,889,566
EU contribution
EUR 6,699,755
Participants
19 from 9 countries
Topic
FP7_NMP-2007-4.0-5
Grant agreement
214395

Coordinated by Rina Consulting SpA (ITItaly).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Rina Consulting SpAITItalyCoordinatorEUR 952,968PIC (1.00)
Albany Engineered Composites GmbHDEGermanyParticipantEUR 50,555PIC (1.00)
Comat Composite Materials GmbHDEGermanyParticipantEUR 170,645PIC (1.00)
Leibniz-Institut Fur Verbundwerkstoffe GmbHDEGermanyParticipantEUR 275,200known name (0.95)
Acciona Construccion SAESSpainParticipantEUR 184,200PIC (1.00)
Ikerlan S. CoopESSpainParticipantEUR 308,542PIC (1.00)
The University Court of the University of St AndrewsGBUnited KingdomParticipantEUR 293,040PIC (1.00)
Centre for Renewable Energy Sources and Saving FondationGRGreeceParticipantEUR 302,592PIC (1.00)
Ethnicon Metsovion PolytechnionGRGreeceParticipantEUR 1,451,222PIC (1.00)
Schneider Electric AeGRGreeceParticipantEUR 284,784PIC (1.00)
Cave S.R.LITItalyParticipantEUR 209,600PIC (1.00)
I.C.I Caldaie SpAITItalyParticipantEUR 403,900PIC (1.00)
IDROGEN2 SRLITItalyParticipantEUR 600,800PIC (1.00)
Scame Sistemi S.R.L.ITItalyParticipantEUR 543,082PIC (1.00)
Van Berkel en Bos U.N. Studio BVNLNetherlandsParticipantEUR 58,402PIC (1.00)
Dnv AsNONorwayParticipantEUR 180,895PIC (1.00)
Decsoft SAPLPolandParticipantEUR 180,000PIC (1.00)
Catator ABSESwedenParticipantEUR 191,128PIC (1.00)
Skanska Nya Hem ABSESwedenParticipantEUR 58,200PIC (1.00)

Changes of the consortium

First seen on with 19 participants from 9 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.