Skip to content

H2020

ERIFORE

Research Infrastructure for Circular Forest Bioeconomy

Programme
Horizon 2020
Started
Ends
Duration
25 months
Total cost
EUR 2,630,950
EU contribution
EUR 2,628,700
Participants
15 from 10 countries
Topic
H2020_INFRADEV-1-2014
Grant agreement
654371

Coordinated by Teknologian Tutkimuskeskus Vtt OY (FIFinland).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Teknologian Tutkimuskeskus Vtt OYFIFinlandCoordinatorEUR 417,304known name (0.95)
Kompetenzzentrum Holz GmbHATAustriaParticipantEUR 162,500known name (0.95)
Bio Base Europe Pilot Plant VzwBEBelgiumParticipantEUR 115,000known name (0.95)
Fraunhofer Gesellschaft Zur Forderung der Angewandten Forschung EvDEGermanyParticipantEUR 290,273known name (0.95)
Fundacion Tecnalia Research & InnovationESSpainParticipantEUR 182,500PIC (1.00)
Aalto Korkeakoulusaatio SrFIFinlandParticipantEUR 210,000VAT number (0.97)
Institut National de Recherche Pour L'Agriculture, L'Alimentation et L'EnvironnementFRFranceParticipantEUR 102,844known name (0.95)
Institut Technologique Fcba (Foretcellulose Bois-Construction Ameublement)FRFranceParticipantEUR 168,364VAT number (0.97)
Latvijas Valsts Koksnes Kimijas InstitutsLVLatviaParticipantEUR 230,000known name (0.95)
Sintef AsNONorwayParticipantEUR 147,486known name (0.95)
Stiftelsen SintefNONorwayParticipantEUR 74,889PIC (1.00)
Institutul de Chimie Macromoleculara Petru PoniRORomaniaParticipantEUR 100,000known name (0.95)
Kungliga Tekniska HoegskolanSESwedenParticipantEUR 117,000PIC (1.00)
Rise Processum ABSESwedenParticipantEUR 310,540PIC (1.00)
Rise Research Institutes of Sweden ABSESwedenThird partyNot statedknown name (0.95)

Changes of the consortium

First seen on with 15 participants from 10 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.