Skip to content

HORIZON

GridForLoads

Grid Forming Loads to provide maximum flexibility and enable future power systems with very high renewable generation penetration

Programme
Horizon Europe
Started
Ends
Duration
42 months
Total cost
EUR 2,499,813
EU contribution
EUR 2,499,813
Participants
7 from 5 countries
Topic
HORIZON_HORIZON-CL5-2024-D2-01-04
Grant agreement
101192350

Coordinated by Universitat Politecnica de Catalunya (ESSpain).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Universitat Politecnica de CatalunyaESSpainCoordinatorEUR 647,544known name (0.97)
Ait Austrian Institute of Technology GmbHATAustriaParticipantEUR 400,069known name (0.95)
Schweizerische Bundesbahnen SbbCHSwitzerlandAssociated partnerEUR 0known name (0.95)
Eroots Analytics SLESSpainParticipantEUR 195,313PIC (1.00)
Wall Box Chargers SLESSpainParticipantEUR 400,900PIC (1.00)
Supergrid InstituteFRFranceParticipantEUR 656,125known name (0.95)
Ecovibes P.C.GRGreeceParticipantEUR 199,863PIC (1.00)

Changes of the consortium

First seen on with 7 participants from 5 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.