Skip to content

FP7

SAFECLADDING

IMPROVED FASTENING SYSTEMS OF CLADDING WALL PANELS OF PRECAST BUILDINGS IN SEISMIC ZONES

Programme
Seventh Framework Programme
Started
Ends
Duration
36 months
Total cost
EUR 2,775,364
EU contribution
EUR 2,118,600
Participants
14 from 7 countries
Topic
FP7_SME-2012-2
Grant agreement
314122

Coordinated by Bureau International du Beton Manufacture (BEBelgium).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium
OrganisationCountryRoleEU contributionRecognised by
Bureau International du Beton ManufactureBEBelgiumCoordinatorEUR 782,739PIC (1.00)
Jrc -Joint Research Centre- European CommissionBEBelgiumParticipantNot statedPIC (1.00)
European Engineered Construction Systems Association EvDEGermanyParticipantEUR 54,120PIC (1.00)
Asociacion Nacional de Prefabricados y Derivados del Cemento - AndeceESSpainParticipantEUR 113,089PIC (1.00)
Ethnicon Metsovion PolytechnionGRGreeceParticipantNot statedPIC (1.00)
Assobeton - Associazione Nazionale Industrie Manufatti CementiziITItalyParticipantEUR 418,306PIC (1.00)
B.S. Italia SpAITItalyParticipantEUR 95,599PIC (1.00)
Politecnico di MilanoITItalyParticipantNot statedknown name (0.95)
Univerza v LjubljaniSISloveniaParticipantNot statedknown name (0.95)
Afaprefabrik Prefabrike Beton San.ve Tic. AsTRTürkiyeParticipantEUR 15,015PIC (1.00)
Istanbul Teknik UniversitesiTRTürkiyeParticipantNot statedPIC (1.00)
Turkiye Prefabrik Birligi Dernegi - Turkish Precast Concrete Association TpcaTRTürkiyeParticipantEUR 580,609PIC (1.00)
Yapi Merkezi Insaat Ve Sanayi AsTRTürkiyeParticipantEUR 14,676PIC (1.00)
Yapi Merkezi Prefabrikasyon AsTRTürkiyeParticipantEUR 44,447PIC (1.00)

Changes of the consortium

First seen on with 14 participants from 7 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.