Skip to content

FP7

SITEX

Sustainable network of Independent Technical EXpertise for radioactive waste disposal

Programme
Seventh Framework Programme
Started
Ends
Duration
24 months
Total cost
EUR 1,363,513
EU contribution
EUR 950,080
Participants
15 from 10 countries
Topic
FP7_Fission-2011-1.1.2
Grant agreement
295889

Coordinated by Institut de Radioprotection et de Surete Nucleaire (FRFrance).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium
OrganisationCountryRoleEU contributionRecognised by
Institut de Radioprotection et de Surete NucleaireFRFranceCoordinatorEUR 246,257known name (0.95)
Bel vBEBelgiumParticipantEUR 92,020PIC (1.00)
Federaal Agentschap Voor Nucleaire ControleBEBelgiumParticipantEUR 113,848PIC (1.00)
Canadian Nuclear Safety CommissionCACanadaParticipantNot statedPIC (1.00)
Eidgenossisches Nuklearsicherheinspektorat EnsiCHSwitzerlandParticipantEUR 16,371PIC (1.00)
Ujv Rez AsCZCzechiaParticipantEUR 57,780known name (0.95)
Gesellschaft Fur Anlagen und Reaktorsicherheit (Grs) gGmbHDEGermanyParticipantEUR 62,000PIC (1.00)
Autorite de Surete Nucleaire et de RadioprotectionFRFranceParticipantEUR 22,000known name (0.95)
European Nuclear Safety Training and Tutoring InstituteFRFranceParticipantEUR 50,932PIC (1.00)
Ministere de L'Ecologie, du Developpement Durable des Transports et du LogementFRFranceParticipantEUR 0PIC (1.00)
Mutadis Consultants SarlFRFranceParticipantEUR 86,456PIC (1.00)
Lietuvos Energetikos InstitutasLTLithuaniaParticipantEUR 38,520PIC (1.00)
Nuclear Research and Consultancy GroupNLNetherlandsParticipantEUR 46,652known name (0.95)
StralsakerhetsmyndighetenSESwedenParticipantEUR 23,611known name (0.95)
Decom AsSKSlovakiaParticipantEUR 85,600PIC (1.00)

Changes of the consortium

First seen on with 15 participants from 10 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.