H2020
R2CA
REDUCTION OF RADIOLOGICAL CONSEQUENCES OF DESIGN BASIS AND DESIGN EXTENDION ACCIDENTS
- Programme
- Horizon 2020
- Started
- Ends
- Duration
- 52 months
- Total cost
- EUR 4,156,896
- EU contribution
- EUR 3,184,941
- Participants
- 17 from 11 countries
- Topic
- H2020_NFRP-2018-1
- Grant agreement
- 847656
Coordinated by Institut de Radioprotection et de Surete Nucleaire (FRFrance).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Institut de Radioprotection et de Surete Nucleaire | FRFrance | Coordinator | EUR 701,437 | known name (0.95) |
| Universitaet Fuer Bodenkultur Wien | ATAustria | Participant | EUR 212,848 | PIC (1.00) |
| Bel v | BEBelgium | Participant | EUR 95,625 | PIC (1.00) |
| Jrc -Joint Research Centre- European Commission | BEBelgium | Participant | EUR 177,417 | PIC (1.00) |
| Tractebel Engineering S.A. | BEBelgium | Participant | EUR 149,700 | known name (0.95) |
| Ujv Rez As | CZCzechia | Participant | EUR 92,300 | known name (0.95) |
| Helmholtz-Zentrum Dresden-Rossendorf Ev | DEGermany | Participant | EUR 237,500 | PIC (1.00) |
| Centro de Investigaciones Energeticas Medioambientales y Tecnologicas | ESSpain | Participant | EUR 194,000 | VAT number (0.97) |
| Teknologian Tutkimuskeskus Vtt OY | FIFinland | Participant | EUR 219,878 | known name (0.95) |
| Electricite de France | FRFrance | Participant | EUR 135,921 | known name (0.95) |
| Hun-Ren Energiatudomanyi Kutatokozpont | HUHungary | Participant | EUR 138,750 | known name (0.95) |
| Agenzia Nazionale Per le Nuove Tecnologie, L'Energia e Lo Sviluppo Economico Sostenibile | ITItaly | Participant | EUR 215,178 | PIC (1.00) |
| Nine Nuclear and Industrial Engineering SRL | ITItaly | Participant | EUR 170,625 | PIC (1.00) |
| Politecnico di Milano | ITItaly | Participant | EUR 118,396 | known name (0.95) |
| Lietuvos Energetikos Institutas | LTLithuania | Participant | EUR 63,375 | PIC (1.00) |
| Limited Liability Company Analytical Research Bureau for Npp Safety | UAUkraine | Participant | EUR 177,305 | PIC (1.00) |
| State Enterprise State Scientific and Technical Center for Nuclear and Radiation Safety | UAUkraine | Participant | EUR 84,688 | PIC (1.00) |
Changes of the consortium
First seen on with 17 participants from 11 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.