H2020
AEROBI
AErial RObotic System for In-Depth Bridge Inspection by Contact
- Programme
- Horizon 2020
- Started
- Ends
- Duration
- 36 months
- Total cost
- EUR 3,584,850
- EU contribution
- EUR 3,080,377
- Participants
- 12 from 8 countries
- Topic
- H2020_ICT-24-2015
- Grant agreement
- 687384
Coordinated by Airbus Defence and Space Sas (FRFrance).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Airbus Defence and Space Sas | FRFrance | Coordinator | EUR 438,277 | PIC (1.00) |
| Forum des Laboratoires Nationaux Europeens de Recherche Routiere Fehrlaisbl | BEBelgium | Participant | EUR 165,558 | PIC (1.00) |
| Risa Sicherheitsanalysen GmbH | DEGermany | Participant | EUR 204,400 | PIC (1.00) |
| Stiftung Frankfurt Institute for Advanced Studies | DEGermany | Participant | EUR 481,100 | PIC (1.00) |
| Fundacion Andaluza Para El Desarrollo Aeroespacial | ESSpain | Participant | EUR 379,375 | known name (0.95) |
| Universidad de Sevilla | ESSpain | Participant | EUR 376,500 | known name (0.95) |
| Universite Gustave Eiffel | FRFrance | Third party | Not stated | known name (0.95) |
| TRL Limited | GBUnited Kingdom | Third party | Not stated | known name (0.95) |
| D. Mpairaktaris Kai Synergates-Grafeion Technikon Meleton Etaireia Periorismenis Efthynis | GRGreece | Participant | EUR 163,520 | PIC (1.00) |
| Egnatia Odos Ae | GRGreece | Participant | EUR 151,288 | PIC (1.00) |
| Netivei Israel - National Transport Infrastructure Company Ltd | ILIsrael | Participant | EUR 155,800 | PIC (1.00) |
| Tecnic Consulting Engineers | ITItaly | Participant | EUR 202,825 | PIC (1.00) |
Changes of the consortium
First seen on with 12 participants from 8 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.