H2020
PVadapt
Prefabrication, Recyclability and Modularity for cost reductions in Smart BIPV systems
- Programme
- Horizon 2020
- Started
- Ends
- Duration
- 42 months
- Total cost
- EUR 11,067,125
- EU contribution
- EUR 8,978,434
- Participants
- 19 from 11 countries
- Topic
- H2020_LC-SC3-RES-6-2018
- Grant agreement
- 818342
Coordinated by Merit Consulting House (BEBelgium).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Merit Consulting House | BEBelgium | Coordinator | EUR 704,421 | PIC (1.00) |
| Alchemia-Nova GmbH | ATAustria | Participant | EUR 819,875 | PIC (1.00) |
| Architekturburo Reinberg Zt GmbH | ATAustria | Participant | EUR 184,800 | PIC (1.00) |
| Hochschule Fur Angewandte Wissenschaften Burgenland GmbH | ATAustria | Participant | EUR 800,125 | PIC (1.00) |
| Emtech GmbH | DEGermany | Participant | EUR 424,396 | PIC (1.00) |
| Isea S. Coop. | ESSpain | Third party | Not stated | PIC (1.00) |
| Krean S.coop. | ESSpain | Participant | EUR 259,712 | PIC (1.00) |
| Viviendas Municipales de Bilbao Organismo Autonomo Local | ESSpain | Participant | EUR 458,510 | VAT number (0.97) |
| Apollon Solar | FRFrance | Participant | EUR 327,815 | PIC (1.00) |
| Brunel University London | GBUnited Kingdom | Participant | EUR 815,250 | known name (0.95) |
| Flint Engineering Ltd | GBUnited Kingdom | Participant | EUR 461,388 | PIC (1.00) |
| Anonymos Etaireia Kataskevon-Technikon Ergon, Emporikon, Viomichanikonkai Nautiliakon Epicheiriseon Kon'Kat | GRGreece | Participant | EUR 382,121 | PIC (1.00) |
| Core Innovation and Technology Oe | GRGreece | Participant | EUR 311,500 | PIC (1.00) |
| Etaireia Ydreyseos Kai Apochetefseos Proteyoysis Anonimi Etaireia | GRGreece | Participant | EUR 303,459 | PIC (1.00) |
| Ethnicon Metsovion Polytechnion | GRGreece | Participant | EUR 657,500 | PIC (1.00) |
| University College Cork - National University of Ireland, Cork | IEIreland | Participant | EUR 487,250 | VAT number (0.97) |
| Unismart - Fondazione Universita Degli Studi di Padova | ITItaly | Participant | EUR 264,250 | PIC (1.00) |
| Sintef As | NONorway | Participant | EUR 841,813 | known name (0.95) |
| Cool Haven - Habitacoes Modulares e Eco-Sustentaveis SA | PTPortugal | Participant | EUR 474,250 | PIC (1.00) |
Changes of the consortium
First seen on with 19 participants from 11 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.