Skip to content

FP7

ALEF

Aerodynamic loads estimation at extremes of the flight envelope

Programme
Seventh Framework Programme
Started
Ends
Duration
36 months
Total cost
EUR 5,523,439
EU contribution
EUR 3,390,000
Participants
15 from 7 countries
Topic
FP7_AAT-2007-4.1-01
Grant agreement
211785

Coordinated by Airbus Operations Sas (FRFrance).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Airbus Operations SasFRFranceCoordinatorEUR 195,096PIC (1.00)
RUAG Schweiz AGCHSwitzerlandParticipantEUR 128,650PIC (1.00)
Airbus Defence and Space GmbHDEGermanyParticipantEUR 217,001PIC (1.00)
Airbus Helicopters Deutschland GmbHDEGermanyParticipantEUR 96,856PIC (1.00)
Deutsches Zentrum Fur Luft - Und Raumfahrt EvDEGermanyParticipantEUR 327,926known name (0.97)
Airbus Defence and Space SAESSpainParticipantEUR 150,300PIC (1.00)
Airbus Operations SLESSpainParticipantEUR 48,548PIC (1.00)
Centre Internacional de Metodes Numerics en EnginyeriaESSpainParticipantEUR 159,126VAT number (0.97)
Centre Europeen de Recherche et Deformation Avancee en Calcul ScientifiqueFRFranceParticipantEUR 105,008PIC (1.00)
C.I.R.A. Centro Italiano Ricerche Aerospaziali ScpaITItalyParticipantEUR 192,309PIC (1.00)
Optimad Engineering SRLITItalyParticipantEUR 110,100PIC (1.00)
Stichting Koninklijk Nederlands Lucht - En RuimtevaartcentrumNLNetherlandsParticipantEUR 226,125PIC (1.00)
Kungliga Tekniska HoegskolanSESwedenParticipantEUR 185,600PIC (1.00)
Saab AktiebolagSESwedenParticipantEUR 128,998PIC (1.00)
Totalforsvarets ForskningsinstitutSESwedenParticipantEUR 236,250PIC (1.00)

Changes of the consortium

First seen on with 15 participants from 7 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.