Circular Manufacturing 5.0: Human-Centred AI-aided Digital Framework for Closed-loop Photovoltaic (PV) products Value Chains

Programme
Horizon Europe
Started
Ends
Duration
36 months
Total cost
EUR 5,997,000
EU contribution
EUR 5,997,000
Participants
8 from 6 countries
Topic
HORIZON_HORIZON-CL4-2024-TWIN-TRANSITION-01-05
Grant agreement
101178331

Coordinated by Ethniko Kentro Erevnas Kai Technologikis Anaptyxis (GRGreece).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Ethniko Kentro Erevnas Kai Technologikis AnaptyxisGRGreeceCoordinatorEUR 923,750PIC (1.00)
Scuola Universitaria Professionale della Svizzera ItalianaCHSwitzerlandAssociated partnerEUR 0PIC (1.00)
Sunage SACHSwitzerlandAssociated partnerEUR 0PIC (1.00)
J&g Engineering & Architecture LtdCYCyprusParticipantEUR 147,000PIC (1.00)
Asca GmbH & Co KGDEGermanyParticipantEUR 306,250PIC (1.00)
Green Deal Dataspace E.V.DEGermanyParticipantEUR 210,000PIC (1.00)
Xgility LimitedIEIrelandParticipantEUR 417,500PIC (1.00)
Institutt for EnergiteknikkNONorwayParticipantEUR 312,750known name (0.95)

Changes of the consortium

First seen on with 8 participants from 6 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.