Skip to content

H2020

HydroFlex

Increasing the value of Hydropower through increased Flexibilty

Programme
Horizon 2020
Started
Ends
Duration
48 months
Total cost
EUR 5,716,989
EU contribution
EUR 5,426,689
Participants
16 from 5 countries
Topic
H2020_LCE-07-2016-2017
Grant agreement
764011

Coordinated by Norges Teknisk-Naturvitenskapelige Universitet Ntnu (NONorway).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Norges Teknisk-Naturvitenskapelige Universitet NtnuNONorwayCoordinatorEUR 1,886,406known name (0.95)
Rheinisch-Westfaelische Technische Hochschule AachenDEGermanyParticipantEUR 262,745PIC (1.00)
University of StrathclydeGBUnited KingdomParticipantEUR 307,163known name (0.95)
Ss. Cyril and Methodius University in SkopjeMKNorth MacedoniaParticipantEUR 137,061PIC (1.00)
Abb AsNONorwayParticipantEUR 0PIC (1.00)
Edr & Medeso AsNONorwayParticipantEUR 296,934PIC (1.00)
Lyse Produksjon ASNONorwayParticipantEUR 0PIC (1.00)
Multiconsult Norge AsNONorwayParticipantEUR 109,300known name (0.95)
Rainpower Norge AsNONorwayParticipantEUR 188,819PIC (1.00)
Sintef Energi AsNONorwayParticipantEUR 160,391PIC (1.00)
Statkraft Energi AsNONorwayParticipantEUR 0PIC (1.00)
Stiftelsen Norsk Institutt for Naturforskning NinaNONorwayParticipantEUR 319,035PIC (1.00)
Chalmers Tekniska Hogskola ABSESwedenParticipantEUR 456,068PIC (1.00)
Lulea Tekniska UniversitetSESwedenParticipantEUR 879,189known name (0.95)
Uppsala UniversitetSESwedenParticipantEUR 423,579known name (0.95)
Vattenfall ABSESwedenParticipantEUR 0known name (0.95)

Changes of the consortium

First seen on with 16 participants from 5 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.