H2020
HydroFlex
Increasing the value of Hydropower through increased Flexibilty
- Programme
- Horizon 2020
- Started
- Ends
- Duration
- 48 months
- Total cost
- EUR 5,716,989
- EU contribution
- EUR 5,426,689
- Participants
- 16 from 5 countries
- Topic
- H2020_LCE-07-2016-2017
- Grant agreement
- 764011
Coordinated by Norges Teknisk-Naturvitenskapelige Universitet Ntnu (NONorway).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Norges Teknisk-Naturvitenskapelige Universitet Ntnu | NONorway | Coordinator | EUR 1,886,406 | known name (0.95) |
| Rheinisch-Westfaelische Technische Hochschule Aachen | DEGermany | Participant | EUR 262,745 | PIC (1.00) |
| University of Strathclyde | GBUnited Kingdom | Participant | EUR 307,163 | known name (0.95) |
| Ss. Cyril and Methodius University in Skopje | MKNorth Macedonia | Participant | EUR 137,061 | PIC (1.00) |
| Abb As | NONorway | Participant | EUR 0 | PIC (1.00) |
| Edr & Medeso As | NONorway | Participant | EUR 296,934 | PIC (1.00) |
| Lyse Produksjon AS | NONorway | Participant | EUR 0 | PIC (1.00) |
| Multiconsult Norge As | NONorway | Participant | EUR 109,300 | known name (0.95) |
| Rainpower Norge As | NONorway | Participant | EUR 188,819 | PIC (1.00) |
| Sintef Energi As | NONorway | Participant | EUR 160,391 | PIC (1.00) |
| Statkraft Energi As | NONorway | Participant | EUR 0 | PIC (1.00) |
| Stiftelsen Norsk Institutt for Naturforskning Nina | NONorway | Participant | EUR 319,035 | PIC (1.00) |
| Chalmers Tekniska Hogskola AB | SESweden | Participant | EUR 456,068 | PIC (1.00) |
| Lulea Tekniska Universitet | SESweden | Participant | EUR 879,189 | known name (0.95) |
| Uppsala Universitet | SESweden | Participant | EUR 423,579 | known name (0.95) |
| Vattenfall AB | SESweden | Participant | EUR 0 | known name (0.95) |
Changes of the consortium
First seen on with 16 participants from 5 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.