FP7
TRANS-IND
Integrated cost-effective construction process for transport infrastructures, based on a flexible industrialisation of FRP components
- Programme
- Seventh Framework Programme
- Started
- Ends
- Duration
- 48 months
- Total cost
- EUR 9,764,514
- EU contribution
- EUR 6,099,175
- Participants
- 18 from 9 countries
- Topic
- FP7_NMP-2008-3.4-2
- Grant agreement
- 229142
Coordinated by Mostostal Warszawa SA (PLPoland).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Mostostal Warszawa SA | PLPoland | Coordinator | EUR 661,070 | PIC (1.00) |
| Huntsman Advanced Materials (Switzerland) GmbH | CHSwitzerland | Participant | EUR 106,400 | PIC (1.00) |
| Fraunhofer Gesellschaft Zur Forderung der Angewandten Forschung Ev | DEGermany | Participant | EUR 347,260 | known name (0.95) |
| Leibniz-Institut Fur Verbundwerkstoffe GmbH | DEGermany | Participant | EUR 276,240 | known name (0.95) |
| Technische Universitaet Dresden | DEGermany | Participant | EUR 202,648 | PIC (1.00) |
| Acciona Construccion SA | ESSpain | Participant | EUR 558,000 | PIC (1.00) |
| Atos Spain SA | ESSpain | Participant | EUR 141,230 | PIC (1.00) |
| Fundacion Tecnalia Research & Innovation | ESSpain | Participant | EUR 698,144 | PIC (1.00) |
| Semantic Systems SL | ESSpain | Participant | EUR 233,696 | PIC (1.00) |
| Solintel M & P SL | ESSpain | Participant | EUR 237,328 | PIC (1.00) |
| Umeco Structural Materials (Derby) Limited | GBUnited Kingdom | Participant | EUR 217,401 | PIC (1.00) |
| Rina Consulting SpA | ITItaly | Participant | EUR 240,489 | PIC (1.00) |
| Universita Politecnica Delle Marche | ITItaly | Participant | EUR 306,264 | known name (0.95) |
| Company for Electronics, Design and Production Mikrosam Import - Export Prilep Ad | MKNorth Macedonia | Participant | EUR 462,336 | PIC (1.00) |
| BV Machinefabriek van Wees Tilburg | NLNetherlands | Participant | EUR 477,016 | PIC (1.00) |
| Nederlandse Organisatie Voor Toegepast Natuurwetenschappelijk Onderzoek Tno | NLNetherlands | Participant | EUR 285,877 | known name (0.95) |
| Asm Research Solutions Strategy Spolka z Ograniczona Odpowiedzialnoscia | PLPoland | Participant | EUR 181,472 | PIC (1.00) |
| Gradbeni Institut Zrmk Doo | SISlovenia | Participant | EUR 214,669 | PIC (1.00) |
Changes of the consortium
First seen on with 18 participants from 9 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.