H2020
C2NET
Cloud Collaborative Manufacturing Networks (C2NET)
- Programme
- Horizon 2020
- Started
- Ends
- Duration
- 36 months
- Total cost
- EUR 7,126,495
- EU contribution
- EUR 7,126,495
- Participants
- 20 from 6 countries
- Topic
- H2020_FoF-01-2014
- Grant agreement
- 636909
Coordinated by Atos It Solutions and Services Sro (SKSlovakia).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Atos It Solutions and Services Sro | SKSlovakia | Coordinator | EUR 50,950 | PIC (1.00) |
| Laboratoire Virtuel Europeen Dans le Domaine de L'Interoperabilite Desentreprises | BEBelgium | Participant | EUR 282,500 | PIC (1.00) |
| Atos Spain SA | ESSpain | Participant | EUR 585,925 | PIC (1.00) |
| Ikerlan S. Coop | ESSpain | Participant | EUR 550,588 | PIC (1.00) |
| Instituto Tecnologico de Informatica | ESSpain | Participant | EUR 456,978 | PIC (1.00) |
| Novatec Diseño e Industrializacion SL | ESSpain | Participant | EUR 155,406 | PIC (1.00) |
| Plastic Omnium Automotive Espana SA | ESSpain | Participant | EUR 254,438 | PIC (1.00) |
| Universitat Politecnica de Valencia | ESSpain | Participant | EUR 434,550 | known name (0.95) |
| Fluidhouse OY - FH | FIFinland | Participant | EUR 236,625 | PIC (1.00) |
| Tampereen Korkeakoulusaatio Sr | FIFinland | Participant | EUR 701,863 | known name (0.95) |
| Teknologian Tutkimuskeskus Vtt OY | FIFinland | Participant | EUR 534,773 | known name (0.95) |
| Association Pour la Recherche et le Developpement des Methodes et Processus Industriels | FRFrance | Participant | EUR 392,714 | PIC (1.00) |
| Institut Mines-Telecom | FRFrance | Third party | Not stated | known name (0.95) |
| Linagora Grand Sud Ouest SA | FRFrance | Participant | EUR 562,750 | PIC (1.00) |
| Pierre Fabre Dermo-Cosmetique Sas | FRFrance | Participant | EUR 354,688 | PIC (1.00) |
| Antonio Abreu Metalomecanica,lda. | PTPortugal | Participant | EUR 160,625 | PIC (1.00) |
| Associacao Universidade Empresa Para Desenvolvimento Tecminho | PTPortugal | Participant | EUR 162,375 | PIC (1.00) |
| Caixa Magica Software SA | PTPortugal | Participant | EUR 478,125 | PIC (1.00) |
| Flexefelina SA | PTPortugal | Participant | EUR 160,625 | PIC (1.00) |
| Uninova-Instituto de Desenvolvimento de Novas Tecnologias-Associacao | PTPortugal | Participant | EUR 610,000 | PIC (1.00) |
Changes of the consortium
First seen on with 20 participants from 6 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.