Skip to content

FP7

MEMSCON

Radio Frequency Identification Tags Linked to on Board Micro-Electro-Mechanical Systems in a Wireless, Remote and Intelligent Monitoring and Assessment System for Maintenance of CONstructed Facilities

Programme
Seventh Framework Programme
Started
Ends
Duration
42 months
Total cost
EUR 4,976,007
EU contribution
EUR 3,814,802
Participants
12 from 7 countries
Topic
FP7_NMP-2007-4.0-6
Grant agreement
212004

Coordinated by Erevnitiko Panepistimiako Institouto Systimaton Epikoinonion Kai Ypologiston (GRGreece).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Erevnitiko Panepistimiako Institouto Systimaton Epikoinonion Kai YpologistonGRGreeceCoordinatorEUR 324,320PIC (1.00)
Interuniversitair Micro-Electronica CentrumBEBelgiumParticipantEUR 401,924PIC (1.00)
Risa Sicherheitsanalysen GmbHDEGermanyParticipantEUR 366,709PIC (1.00)
Memscap SAFRFranceParticipantEUR 534,411PIC (1.00)
Advanced Microwave Systems LtdGRGreeceParticipantEUR 202,298PIC (1.00)
Akropol Charagkionis Anonymos EtaireiaGRGreeceParticipantEUR 257,318PIC (1.00)
D. Mpairaktaris Kai Synergates-Grafeion Technikon Meleton Etaireia Periorismenis EfthynisGRGreeceParticipantEUR 243,061PIC (1.00)
Tecnic Consulting EngineersITItalyParticipantEUR 296,898PIC (1.00)
Universita Degli Studi di TrentoITItalyParticipantEUR 190,082known name (0.95)
Concept to Volume BVNLNetherlandsParticipantEUR 348,529PIC (1.00)
Stichting Imec NederlandNLNetherlandsParticipantEUR 450,977known name (0.95)
Sitex 45 SRLRORomaniaParticipantEUR 198,275PIC (1.00)

Changes of the consortium

First seen on with 12 participants from 7 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.