Skip to content

FP7

IMPRESS

Flexible Compression Injection Moulding Platform for Multi-Scale Surface Structures

Programme
Seventh Framework Programme
Started
Ends
Duration
36 months
Total cost
EUR 7,038,468
EU contribution
EUR 4,616,297
Participants
14 from 6 countries
Topic
FP7_FoF.NMP.2010-3
Grant agreement
260174

Coordinated by Centre Technique Industriel de la Plasturgie et des Composites (FRFrance).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Centre Technique Industriel de la Plasturgie et des CompositesFRFranceCoordinatorEUR 726,373PIC (1.00)
Csem Centre Suisse D'Electronique et de Microtechnique SA - Recherche et DeveloppementCHSwitzerlandParticipantEUR 672,415PIC (1.00)
Kistler Instrumente AGCHSwitzerlandParticipantEUR 145,218PIC (1.00)
ACP - Advanced Clean Production GmbHDEGermanyParticipantEUR 206,800PIC (1.00)
Beckman Coulter Biomedical GmbHDEGermanyParticipantEUR 40,721PIC (1.00)
Carl Zeiss AGDEGermanyParticipantEUR 324,316known name (0.95)
Fraunhofer Gesellschaft Zur Forderung der Angewandten Forschung EvDEGermanyParticipantEUR 352,525known name (0.95)
Billion SasFRFranceParticipantEUR 312,254PIC (1.00)
Compose SasFRFranceParticipantEUR 265,620PIC (1.00)
PolymerisFRFranceParticipantEUR 83,700PIC (1.00)
Sillia Energie SasFRFranceParticipantEUR 120,253PIC (1.00)
Cardiff UniversityGBUnited KingdomParticipantEUR 331,618known name (0.95)
Crospon LimitedIEIrelandParticipantEUR 237,132PIC (1.00)
Moldetipo II-Engineering Moulds and Prototypes (Portugal) LdaPTPortugalParticipantEUR 314,030PIC (1.00)

Changes of the consortium

First seen on with 14 participants from 6 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.