FP7
SIFEM
Semantic Infostructure interlinking an open source Finite Element tool and libraries with a model repository for the multi-scale Modelling and 3d visualization of the inner-ear
- Programme
- Seventh Framework Programme
- Started
- Ends
- Duration
- 36 months
- Total cost
- EUR 3,915,461
- EU contribution
- EUR 2,909,000
- Participants
- 10 from 9 countries
- Topic
- FP7_ICT-2011.5.2
- Grant agreement
- 600933
Coordinated by University of Galway (IEIreland).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| University of Galway | IEIreland | Coordinator | EUR 452,803 | known name (0.95) |
| Klinikum der Technischen Universität München (Tum Klinikum) | DEGermany | Participant | EUR 105,200 | known name (0.97) |
| University of Southampton | GBUnited Kingdom | Participant | EUR 409,132 | known name (0.95) |
| Erevnitiko Panepistimiako Institouto Systimaton Epikoinonion Kai Ypologiston | GRGreece | Participant | EUR 410,000 | PIC (1.00) |
| Ethniko Kai Kapodistriako Panepistimio Athinon | GRGreece | Participant | EUR 126,193 | PIC (1.00) |
| Netcompany S.A. | LULuxembourg | Participant | EUR 369,613 | PIC (1.00) |
| The Research Trust of Victoria University of Wellington | NZNew Zealand | Participant | EUR 120,180 | PIC (1.00) |
| Istrazivacko Razvojni Centar za Bioinzenjering Bioirc Doo | RSSerbia | Participant | EUR 363,600 | PIC (1.00) |
| Linköping University | SESweden | Participant | EUR 400,871 | PIC (1.00) |
| The Methodist Hospital Research Institute | USUnited States | Participant | EUR 0 | PIC (1.00) |
Changes of the consortium
First seen on with 10 participants from 9 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.