Skip to content

FP7

SIFEM

Semantic Infostructure interlinking an open source Finite Element tool and libraries with a model repository for the multi-scale Modelling and 3d visualization of the inner-ear

Programme
Seventh Framework Programme
Started
Ends
Duration
36 months
Total cost
EUR 3,915,461
EU contribution
EUR 2,909,000
Participants
10 from 9 countries
Topic
FP7_ICT-2011.5.2
Grant agreement
600933

Coordinated by University of Galway (IEIreland).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium
OrganisationCountryRoleEU contributionRecognised by
University of GalwayIEIrelandCoordinatorEUR 452,803known name (0.95)
Klinikum der Technischen Universität München (Tum Klinikum)DEGermanyParticipantEUR 105,200known name (0.97)
University of SouthamptonGBUnited KingdomParticipantEUR 409,132known name (0.95)
Erevnitiko Panepistimiako Institouto Systimaton Epikoinonion Kai YpologistonGRGreeceParticipantEUR 410,000PIC (1.00)
Ethniko Kai Kapodistriako Panepistimio AthinonGRGreeceParticipantEUR 126,193PIC (1.00)
Netcompany S.A.LULuxembourgParticipantEUR 369,613PIC (1.00)
The Research Trust of Victoria University of WellingtonNZNew ZealandParticipantEUR 120,180PIC (1.00)
Istrazivacko Razvojni Centar za Bioinzenjering Bioirc DooRSSerbiaParticipantEUR 363,600PIC (1.00)
Linköping UniversitySESwedenParticipantEUR 400,871PIC (1.00)
The Methodist Hospital Research InstituteUSUnited StatesParticipantEUR 0PIC (1.00)

Changes of the consortium

First seen on with 10 participants from 9 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.