FP7
ELECTRICAL
NOVEL AERONAUTICAL MULTIFUNCTIONAL COMPOSITE STRUCTURES WITH BULK ELECTRICAL CONDUCTIVITY AND SELF-SENSING CAPABILITIES
- Programme
- Seventh Framework Programme
- Started
- Ends
- Duration
- 45 months
- Total cost
- EUR 4,608,275
- EU contribution
- EUR 2,878,153
- Participants
- 13 from 6 countries
- Topic
- FP7_AAT.2010.1.1-4.
- Grant agreement
- 265593
Coordinated by Fundacion Tecnalia Research & Innovation (ESSpain).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Fundacion Tecnalia Research & Innovation | ESSpain | Coordinator | EUR 633,363 | PIC (1.00) |
| Airbus Defence and Space GmbH | DEGermany | Participant | EUR 175,000 | PIC (1.00) |
| Aernnova Engineering Solutions Iberica SA | ESSpain | Participant | EUR 197,880 | PIC (1.00) |
| Airbus Operations SL | ESSpain | Participant | EUR 22,500 | PIC (1.00) |
| Airbus Group Sas | FRFrance | Participant | EUR 202,219 | PIC (1.00) |
| Airbus Operations Sas | FRFrance | Participant | EUR 52,537 | PIC (1.00) |
| Arkema France SA | FRFrance | Participant | EUR 115,100 | PIC (1.00) |
| Centre Technologique Nouvelle-Aquitaine Composites & Materiaux Avances | FRFrance | Participant | EUR 331,441 | PIC (1.00) |
| Short Brothers PLC | GBUnited Kingdom | Participant | EUR 200,833 | PIC (1.00) |
| Umeco Structural Materials (Derby) Limited | GBUnited Kingdom | Participant | EUR 199,880 | PIC (1.00) |
| Inasco Hellas Etaireia Efarmosmenon Aerodiastimikon Epistimon Ee | GRGreece | Participant | EUR 201,900 | PIC (1.00) |
| Panepistimio Patron | GRGreece | Participant | EUR 289,500 | PIC (1.00) |
| Fundacja Partnerstwa Technologicznego Technology Partners | PLPoland | Participant | EUR 187,500 | PIC (1.00) |
Changes of the consortium
First seen on with 13 participants from 6 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.