Skip to content

FP7

MONICO

Fibre Optics-Based Intelligent MONItoring and Assessment System for Proactive Maintenance and Seismic Disaster Prevention in Reinforced COncrete Tunnel Linings

Programme
Seventh Framework Programme
Started
Ends
Duration
30 months
Total cost
EUR 1,498,727
EU contribution
EUR 1,202,834
Participants
8 from 4 countries
Grant agreement
221978

Coordinated by Erevnitiko Panepistimiako Institouto Systimaton Epikoinonion Kai Ypologiston (GRGreece).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Erevnitiko Panepistimiako Institouto Systimaton Epikoinonion Kai YpologistonGRGreeceCoordinatorEUR 28,800PIC (1.00)
Advanced Optics Solutions GmbHDEGermanyParticipantEUR 239,775PIC (1.00)
Risa Sicherheitsanalysen GmbHDEGermanyParticipantEUR 4,320PIC (1.00)
Osmos SAFRFranceParticipantNot statedPIC (1.00)
Optronics Technologies A.B.E.T.E.GRGreeceParticipantEUR 480,909PIC (1.00)
Ght Photonics SRLITItalyParticipantEUR 444,590PIC (1.00)
Tecnic Consulting EngineersITItalyParticipantEUR 4,440PIC (1.00)
Universita Degli Studi di TrentoITItalyParticipantNot statedknown name (0.95)

Changes of the consortium

First seen on with 8 participants from 4 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.