FLEXITRANSTORE

An Integrated Platform for Incresed FLEXIbility in smart TRANSmission grids with STORage Entities and large penetration of Renewable Energy Sources

Programme
Horizon 2020
Started
Ends
Duration
54 months
Total cost
EUR 21,399,588
EU contribution
EUR 17,008,102
Participants
34 from 16 countries
Topic
H2020_LCE-04-2017
Grant agreement
774407

Coordinated by European Dynamics Belgium (BEBelgium).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
European Dynamics BelgiumBEBelgiumCoordinatorEUR 1,989,885PIC (1.00)
Operatori Sistemit Te Transmetimitost - Shoqeri AnonimeALAlbaniaParticipantEUR 54,250PIC (1.00)
EMAXBEBelgiumParticipantEUR 630,875PIC (1.00)
Bulgarska Nezavisima Energijna Borsa EadBGBulgariaParticipantEUR 71,750PIC (1.00)
Electrodistribution Grid West AdBGBulgariaParticipantEUR 36,750PIC (1.00)
Elektroenergien Sistemen Operator EadBGBulgariaParticipantEUR 214,375known name (0.95)
Innovative Energy and Information Technologies LtdBGBulgariaParticipantEUR 112,000PIC (1.00)
Kogen Zagore EoodBGBulgariaParticipantEUR 74,375PIC (1.00)
Software Company EoodBGBulgariaParticipantEUR 303,625PIC (1.00)
Technical University of SofiaBGBulgariaParticipantEUR 980,000PIC (1.00)
Archi Ilektrismou KyprouCYCyprusParticipantEUR 285,250PIC (1.00)
Diacheiristis Systimatos MetaforasCYCyprusParticipantEUR 195,125PIC (1.00)
Rythmistiki Archi Energeias KyprouCYCyprusParticipantEUR 167,500PIC (1.00)
University of CyprusCYCyprusParticipantEUR 843,125known name (0.95)
General Electric Deutschland Holding GmbHDEGermanyParticipantEUR 0PIC (1.00)
Abengoa Innovacion Sociedad AnonimaESSpainParticipantEUR 1,472,577PIC (1.00)
Fundacion Universidad Loyola AndaluciaESSpainParticipantEUR 1,958,703PIC (1.00)
Jema Energy SAESSpainParticipantEUR 1,368,500PIC (1.00)
Schneider Electric Espana SAESSpainParticipantEUR 549,063PIC (1.00)
Ge Energy Products France SncFRFranceParticipantEUR 665,115PIC (1.00)
Schneider Electric France SasFRFranceThird partyNot statedPIC (1.00)
Erevnitiko Panepistimiako Institouto Systimaton Epikoinonion Kai YpologistonGRGreeceParticipantEUR 1,119,600PIC (1.00)
European Dynamics Advanced Information Technology and Telecommunication Systems SAGRGreeceThird partyNot statedPIC (1.00)
Independent Power Transmission Operator SAGRGreeceParticipantEUR 249,375PIC (1.00)
Studio Elektronike Rijeka DooHRCroatiaParticipantEUR 260,663PIC (1.00)
Budapesti Muszaki Es Gazdasagtudomanyi EgyetemHUHungaryParticipantEUR 1,129,750known name (0.95)
Vpp Energy Eromu-Uzemelteto Es Kereskedelmi Zartkoruen Mukodo ReszvenytarsasagHUHungaryParticipantEUR 112,875PIC (1.00)
Smart Wire Grid Europe LimitedIEIrelandParticipantEUR 786,625PIC (1.00)
Luxembourg Institute of Science and TechnologyLULuxembourgParticipantEUR 258,922known name (0.95)
Centro de Investigacao Em Energia Ren - State Grid SAPTPortugalParticipantEUR 178,500PIC (1.00)
Wing Computer Group SRLRORomaniaParticipantEUR 308,000known name (0.95)
Chalmers Tekniska Hogskola ABSESwedenParticipantEUR 303,700PIC (1.00)
C & G Zastopanje, Svetovanje in Inzeniring DooSISloveniaParticipantEUR 191,625PIC (1.00)
Elektro Ljubljana Podjetje Zadistribucijo Elektricne Energije D.D.SISloveniaParticipantEUR 135,625PIC (1.00)

Changes of the consortium

First seen on with 34 participants from 16 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.