FP7
TERRIFIC
Towards Enhanced Integration of Design and Production in the Factory of the Future through Isogeometric Technologies
- Programme
- Seventh Framework Programme
- Started
- Ends
- Duration
- 36 months
- Total cost
- EUR 5,213,450
- EU contribution
- EUR 3,496,000
- Participants
- 9 from 5 countries
- Topic
- FP7_FoF-ICT-2011.7.4
- Grant agreement
- 284981
Coordinated by Stiftelsen Sintef (NONorway).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Stiftelsen Sintef | NONorway | Coordinator | EUR 616,902 | PIC (1.00) |
| Engineering Center Steyr GmbH & Co KG | ATAustria | Participant | EUR 306,000 | PIC (1.00) |
| Universitat Linz | ATAustria | Participant | EUR 287,589 | PIC (1.00) |
| Rheinland-Pfalzische Technische Universitat | DEGermany | Participant | EUR 279,700 | PIC (1.00) |
| Siemens Aktiengesellschaft | DEGermany | Participant | EUR 344,470 | PIC (1.00) |
| Institut National de Recherche en Informatique et Automatique | FRFrance | Participant | EUR 328,179 | PIC (1.00) |
| Topsolid | FRFrance | Participant | EUR 362,177 | PIC (1.00) |
| Universita Degli Studi di Pavia | ITItaly | Participant | EUR 279,700 | known name (0.95) |
| Jotne Connect As | NONorway | Participant | EUR 382,830 | PIC (1.00) |
Changes of the consortium
First seen on with 9 participants from 5 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.