Skip to content

H2020

TELWIND

INTEGRATED TELESCOPIC TOWER AND EVOLVED SPAR FLOATING SUBSTRUCTURE FOR LOW-COST DEEP OFFSHORE WIND AND NEXT GENERATION OF 10MW+ TURBINES

Programme
Horizon 2020
Started
Ends
Duration
36 months
Total cost
EUR 3,498,530
EU contribution
EUR 3,498,530
Participants
11 from 3 countries
Topic
H2020_LCE-02-2015
Grant agreement
654634

Coordinated by Esteyco SA (ESSpain).

Consortium

EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Esteyco SAESSpainCoordinatorEUR 1,784,875PIC (1.00)
Dywidag Systems International GmghDEGermanyParticipantEUR 168,750PIC (1.00)
Technische Universitaet MuenchenDEGermanyParticipantEUR 153,688PIC (1.00)
A.L.E. Heavylift Iberica SAESSpainThird partyNot statedPIC (1.00)
Centro de Estudios y Experimentacion de Obras PublicasESSpainParticipantEUR 223,968VAT number (0.97)
Cobra Instalaciones y Servicios S.AESSpainParticipantEUR 108,875PIC (1.00)
Dywidag Sistemas Constructivos SAESSpainThird partyNot statedPIC (1.00)
Fundacion Instituto de Hidraulica Ambiental de CantabriaESSpainThird partyNot statedPIC (1.00)
Universidad de CantabriaESSpainParticipantEUR 503,125known name (0.95)
Ale Heavylift (R&d) BVNLNetherlandsParticipantEUR 200,250PIC (1.00)
Mecal Wind Turbine Design BVNLNetherlandsParticipantEUR 355,000PIC (1.00)

Changes of the consortium

First seen on with 11 participants from 3 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

Project page on CORDIS (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.