FP7
CONCERTO
Guaranteed Component Assembly with Round Trip Analysis for Energy Efficient High-integrity Multi-core Systems
- Programme
- Seventh Framework Programme
- Started
- Ends
- Duration
- 36 months
- Total cost
- EUR 9,650,442
- EU contribution
- EUR 1,611,624
- Participants
- 16 from 8 countries
- Topic
- FP7_SP1-JTI-ARTEMIS-2012-ASP5
- Grant agreement
- 333053
Coordinated by The Open Group Limited (GBUnited Kingdom).
Consortium
EU contribution per participant as the open data of CORDIS states it; for a participant with linked third parties it may include their share, and a participant whose amount the data does not hold or cannot make consistent shows Not stated. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| The Open Group Limited | GBUnited Kingdom | Coordinator | EUR 103,722 | PIC (1.00) |
| Aicas GmbH | DEGermany | Participant | EUR 162,351 | PIC (1.00) |
| Airbus Group Sas | FRFrance | Participant | EUR 115,227 | PIC (1.00) |
| Atego Sas | FRFrance | Participant | EUR 109,677 | PIC (1.00) |
| Parametric Technology SA | FRFrance | Participant | EUR 61,693 | PIC (1.00) |
| Thales Six Gts France Sas | FRFrance | Participant | EUR 258,101 | PIC (1.00) |
| Aensys Informatikai Kft | HUHungary | Participant | EUR 13,360 | PIC (1.00) |
| Budapesti Muszaki Es Gazdasagtudomanyi Egyetem | HUHungary | Participant | EUR 39,968 | known name (0.95) |
| TECHNOLABS srl | ITItaly | Participant | EUR 216,466 | PIC (1.00) |
| Universita Degli Studi di Firenze | ITItaly | Participant | EUR 55,100 | known name (0.95) |
| Universita Degli Studi di Padova | ITItaly | Participant | EUR 62,518 | known name (0.95) |
| Otg Solutions As | NONorway | Participant | EUR 94,021 | PIC (1.00) |
| Stiftelsen Sintef | NONorway | Participant | EUR 108,655 | PIC (1.00) |
| Critical Software SA | PTPortugal | Participant | EUR 40,444 | PIC (1.00) |
| Instituto Superior de Engenharia do Porto | PTPortugal | Participant | EUR 62,640 | known name (0.95) |
| Malardalens Universitet | SESweden | Participant | EUR 107,682 | known name (0.95) |
Changes of the consortium
First seen on with 16 participants from 8 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
Project page on CORDIS (opens in new tab)
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.