Skip to content

EDF

COMMANDS

Convoy Operations with Manned-unManned Systems

Programme
European Defence Fund
Call year
2021
Duration
36 months
Total cost
EUR 26,835,191
EU contribution
EUR 24,844,239
Participants
21 from 10 countries

Coordinated by Sener Aeroespacial Sociedad Anonima (ESSpain).

Consortium

The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Sener Aeroespacial Sociedad AnonimaESSpainCoordinatorNot statedknown name (1.00)
Eight Bells LtdCYCyprusParticipantNot statedknown name (1.00)
Signalgenerix LimitedCYCyprusParticipantNot statedknown name (1.00)
Skyld Security and Defence LimitedCYCyprusParticipantNot statedknown name (1.00)
Vetronics Research Centre EU LtdCYCyprusParticipantNot statedexact name (0.95)
Vojensky Vyzkumny Ustav SpCZCzechiaParticipantNot statedknown name (1.00)
Scertas GmbHDEGermanyParticipantNot statedexact name (0.95)
Indra Sistemas SAESSpainParticipantNot statedknown name (1.00)
Instituto Nacional de Tecnica Aeroespacial Esteban TerradasESSpainParticipantNot statedknown name (1.00)
Santa Barbara Sistems SAESSpainParticipantNot statedexact name (0.95)
Laboratoire National de Metrologie et D'EssaisFRFranceParticipantNot statedknown name (0.95)
Masa Group SAFRFranceParticipantNot statedknown name (1.00)
Iknowhow SAGRGreeceParticipantNot statedknown name (1.00)
Intracom Defense AeGRGreeceParticipantNot statedknown name (1.00)
Iveco Defence Vehicles SpAITItalyParticipantNot statedexact name (0.95)
Leonardo - Societa Per AzioniITItalyParticipantNot statedknown name (0.95)
Link Campus UniversityITItalyParticipantNot statedknown name (1.00)
Politecnico di MilanoITItalyParticipantNot statedknown name (0.95)
Baltijos Pazangiu Technologiju InstitutasLTLithuaniaParticipantNot statedknown name (1.00)
Wojskowa Akademia Techniczna Im.jaroslawa DabrowskiegoPLPolandParticipantNot statedknown name (0.98)
Clavister ABSESwedenParticipantNot statedexact name (0.95)

How the participants were read

The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.

Read on from 3 pages.

The checks removed or corrected nothing for this factsheet.

Changes of the consortium

First seen on with 21 participants from 10 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

EDF project factsheet (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.