Skip to content

EDF

HiTDOC

Hidden Threat Detection

Programme
European Defence Fund
Call year
2022
Duration
48 months
Total cost
EUR 4,985,440
EU contribution
EUR 4,985,440
Participants
5 from 5 countries

Coordinated by Totalforsvarets Forskningsinstitut (SESweden).

Consortium

The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Totalforsvarets ForskningsinstitutSESwedenCoordinatorNot statedknown name (1.00)
Fraunhofer Gesellschaft Zur Forderung der Angewandten Forschung EvDEGermanyParticipantNot statedknown name (0.95)
instituto nacional de tecnica aeroespacialESSpainParticipantNot statedknown name (1.00)
Laboratoire National de Metrologie et D'EssaisFRFranceParticipantNot statedknown name (0.95)
The Netherlands Organisation for Applied Scientific Research; (TNO); Nederlandse organisatie voor Toegepast Natuurwetenschappelijk OnderzoekNLNetherlandsParticipantNot statedexact name (0.95)

How the participants were read

The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.

Read on from 2 pages.

The checks removed or corrected nothing for this factsheet.

Changes of the consortium

First seen on with 5 participants from 5 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

EDF project factsheet (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.