Skip to content

EDF

PROTEAS

DePloyable Special OpeRations FOrces MulTi Environment CommAnd Post and C2 System (SFCPC2)

Programme
European Defence Fund
Call year
2022
Duration
36 months
Total cost
EUR 23,422,629
EU contribution
EUR 19,999,857
Participants
15 from 8 countries

Coordinated by Intracom Defense Ae (GRGreece).

Consortium

The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Intracom Defense AeGRGreeceCoordinatorNot statedknown name (1.00)
C&v ConsultingBEBelgiumParticipantNot statedknown name (0.95)
DotoceanBEBelgiumParticipantNot statedexact name (0.95)
Eight Bells LtdCYCyprusParticipantNot statedknown name (1.00)
Ubitech LimitedCYCyprusParticipantNot statedknown name (1.00)
Rheinmetall Electronics GmbHDEGermanyParticipantNot statedknown name (0.95)
Commissariat a L Energie Atomique et Aux Energies AlternativesFRFranceParticipantNot statedknown name (0.95)
Hensoldt France SasFRFranceParticipantNot statedknown name (0.95)
Sas ImpactFRFranceParticipantNot statedexact name (0.95)
Thales Six Gts France SasFRFranceParticipantNot statedknown name (1.00)
Integrated Systrems Development SAGRGreeceParticipantNot statedexact name (0.95)
Satways-Olokliromenes Lyseis Asfaleias Kai Amynas-Idiotiki Epicheirisi Parochis Ypiresion Asfaleias (Iepya)-Etaireia Periorismenis EfthynisGRGreeceParticipantNot statedknown name (1.00)
Leonardo - Societa Per AzioniITItalyParticipantNot statedknown name (0.95)
Losberger de boerNLNetherlandsParticipantNot statedexact name (0.95)
SquareheadNONorwayParticipantNot statedexact name (0.95)

How the participants were read

The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.

Read on from 2 pages.

The checks removed or corrected nothing for this factsheet.

Changes of the consortium

First seen on with 15 participants from 8 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

EDF project factsheet (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.