EDF
E-NACSOS
EU NAval Collaborative Surveillance Operational Standard
- Programme
- European Defence Fund
- Call year
- 2022
- Duration
- 48 months
- Total cost
- EUR 101,388,328
- EU contribution
- EUR 64,999,999
- Participants
- 20 from 12 countries
Coordinated by Naval Group (FRFrance).
Consortium
The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Naval Group | FRFrance | Coordinator | Not stated | known name (0.95) |
| Naval Group Belgium | BEBelgium | Participant | Not stated | known name (1.00) |
| Atlas Elektronik GmbH | DEGermany | Participant | Not stated | known name (1.00) |
| Hensoldt Sensors GmbH | DEGermany | Participant | Not stated | known name (1.00) |
| Cafa Tech Ou | EEEstonia | Participant | Not stated | known name (1.00) |
| EM3WORKS | ESSpain | Participant | Not stated | exact name (0.95) |
| Indra Sistemas SA | ESSpain | Participant | Not stated | known name (1.00) |
| Navantia S.A. | ESSpain | Participant | Not stated | known name (1.00) |
| Thales Six Gts France Sas | FRFrance | Participant | Not stated | known name (1.00) |
| Isd Lyseis Olokriromenon Systimatonanonymos Etaireia | GRGreece | Participant | Not stated | known name (1.00) |
| Terra Spatium Ae Proionton Kai Ypiresion | GRGreece | Participant | Not stated | exact name (0.95) |
| Applied Intelligence Analytics Limited | IEIreland | Participant | Not stated | known name (1.00) |
| Elettronica SpA | ITItaly | Participant | Not stated | known name (0.95) |
| Leonardo - Societa Per Azioni | ITItaly | Participant | Not stated | known name (0.95) |
| Stamtech SRL | ITItaly | Participant | Not stated | known name (1.00) |
| Nederlandse Organisatie Voor Toegepast Natuurwetenschappelijk Onderzoek Tno | NLNetherlands | Participant | Not stated | known name (0.95) |
| Thales Nederland BV | NLNetherlands | Participant | Not stated | known name (1.00) |
| Edisoft – Empresa de Serviços e Desenvolvimento de Software, S.A. | PTPortugal | Participant | Not stated | known name (0.95) |
| Ministerul Apararii Nationale | RORomania | Participant | Not stated | known name (1.00) |
| Saab Aktiebolag | SESweden | Participant | Not stated | known name (1.00) |
How the participants were read
The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.
Read on from 3 pages.
The checks removed or corrected nothing for this factsheet.
Changes of the consortium
First seen on with 20 participants from 12 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
EDF project factsheet (opens in new tab)
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.The participants were read from the project factsheet by a language model (see "How the participants were read" below).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.