EDF
FEDERATES
FEDerated Ecosystem of euRopean simulation Assets for Training and decision Support
- Programme
- European Defence Fund
- Call year
- 2022
- Duration
- 36 months
- Total cost
- EUR 35,201,043
- EU contribution
- EUR 29,555,604
- Participants
- 31 from 15 countries
Coordinated by Rheinmetall Electronics GmbH (DEGermany).
Consortium
The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Rheinmetall Electronics GmbH | DEGermany | Coordinator | Not stated | known name (0.95) |
| Ait Austrian Institute of Technology GmbH | ATAustria | Participant | Not stated | known name (0.95) |
| Aditerna GmbH | DEGermany | Participant | Not stated | exact name (0.95) |
| Airbus Defence and Space GmbH | DEGermany | Participant | Not stated | known name (1.00) |
| Vr Lab Ou | EEEstonia | Participant | Not stated | exact name (0.95) |
| Ct Ingenieros Aeronauticos de Automocion e Industriales SL | ESSpain | Participant | Not stated | known name (1.00) |
| Indra Sistemas SA | ESSpain | Participant | Not stated | known name (1.00) |
| Universidad Politecnica de Madrid | ESSpain | Participant | Not stated | known name (0.95) |
| Airbus Defence and Space Sas | FRFrance | Participant | Not stated | known name (1.00) |
| Masa Group SA | FRFrance | Participant | Not stated | known name (1.00) |
| Naval Group | FRFrance | Participant | Not stated | known name (0.95) |
| Thales Avs France Sas | FRFrance | Participant | Not stated | known name (1.00) |
| Planetek Hellas Etaireia Periorismenis Efthynis Ypiresies Chartografisis Meso Doryforou | GRGreece | Participant | Not stated | known name (1.00) |
| Terra Spatium Ae Proionton Kai Ypiresion Geopliroforikis Kai Diastimatos | GRGreece | Participant | Not stated | known name (1.00) |
| Honvedelmi Miniszterium Elektronikai, Logisztikai Es Vagyonkezelo Zartkoruen Mukodo Reszvenytarsasag | HUHungary | Participant | Not stated | exact name (0.95) |
| True Communication Technologies Limited | IEIreland | Participant | Not stated | known name (1.00) |
| Itres | ITItaly | Participant | Not stated | exact name (0.95) |
| Leonardo - Societa Per Azioni | ITItaly | Participant | Not stated | known name (0.95) |
| Mbda Italia SpA | ITItaly | Participant | Not stated | known name (1.00) |
| Stam SRL | ITItaly | Participant | Not stated | known name (1.00) |
| Txt e-Solutions SpA | ITItaly | Participant | Not stated | known name (1.00) |
| Baltijos Pazangiu Technologiju Institutas | LTLithuania | Participant | Not stated | known name (1.00) |
| Sia Exonicus | LVLatvia | Participant | Not stated | exact name (0.95) |
| Nederlandse Organisatie Voor Toegepast Natuurwetenschappelijk Onderzoek Tno | NLNetherlands | Participant | Not stated | known name (0.95) |
| Stichting Koninklijk Nederlands Lucht - En Ruimtevaartcentrum | NLNetherlands | Participant | Not stated | known name (1.00) |
| Forsvarets Forskninginstitutt | NONorway | Participant | Not stated | known name (1.00) |
| Thales Norway | NONorway | Participant | Not stated | known name (0.95) |
| Software Imagination & Vision SRL | RORomania | Participant | Not stated | known name (0.95) |
| 4C Group AB | SESweden | Participant | Not stated | exact name (0.95) |
| Pitch Technologies AB | SESweden | Participant | Not stated | exact name (0.95) |
| Totalforsvarets Forskningsinstitut | SESweden | Participant | Not stated | known name (1.00) |
How the participants were read
The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.
Read on from 4 pages.
What the checks removed or corrected for this factsheet:
- 1: participants with no recognisable country
Changes of the consortium
First seen on with 31 participants from 15 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
EDF project factsheet (opens in new tab)
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.The participants were read from the project factsheet by a language model (see "How the participants were read" below).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.