Skip to content

EDFPROTMOB

ESOCA

European System for Outsized Cargo Airlift (ESOCA)

Programme
European Defence Fund
Call year
2023
Duration
18 months
Total cost
EUR 20,001,811
EU contribution
EUR 20,000,000
Participants
14 from 8 countries
Topic
EDF-2023-RA-PROTMOB-SATOC

Coordinated by Airbus Defence and Space GmbH (DEGermany).

Consortium

The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Airbus Defence and Space GmbHDEGermanyCoordinatorNot statedknown name (1.00)
Airbus Defence and Space SAESSpainParticipantNot statedknown name (1.00)
Gmv Aerospace and Defence S.A.ESSpainParticipantNot statedknown name (0.95)
Industria de Turbo Propulsores S.A.U.ESSpainParticipantNot statedknown name (1.00)
Teknologian Tutkimuskeskus Vtt OYFIFinlandParticipantNot statedknown name (0.95)
Airbus Defence and Space SasFRFranceParticipantNot statedknown name (1.00)
Pricewaterhousecoopers Advisory SasFRFranceParticipantNot statedknown name (1.00)
Safran Aircraft EnginesFRFranceParticipantNot statedknown name (1.00)
Safran Electronics & DefenseFRFranceParticipantNot statedknown name (0.95)
Elliniki Aeroporiki Viomichania Anonymi EtaireiaGRGreeceParticipantNot statedexact name (0.95)
Isd Lyseis Olokriromenon Systimatonanonymos EtaireiaGRGreeceParticipantNot statedexact name (0.95)
Leonardo - Societa Per AzioniITItalyParticipantNot statedknown name (0.95)
Stichting Koninklijk Nederlands Lucht - En RuimtevaartcentrumNLNetherlandsParticipantNot statedknown name (1.00)
Siec Badawcza Lukasiewicz-Instytut LotnictwaPLPolandParticipantNot statedknown name (0.97)

How the participants were read

The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.

Read on from 3 pages.

What the checks removed or corrected for this factsheet:

Changes of the consortium

First seen on with 13 participants from 8 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

EDF project factsheet (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.