EDFSMERO
5G-MILNET
A portable, private, high-performance, secure, robust, resilient and rapidly deployed ad-hoc tactical 5G and beyond communications system for military operations
- Programme
- European Defence Fund
- Call year
- 2023
- Duration
- 36 months
- Total cost
- EUR 3,999,815
- EU contribution
- EUR 3,999,815
- Participants
- 7 from 5 countries
- Topic
- EDF-2023-LS-RA-SMERO-NT
Coordinated by Adamant Aerodiastimikes Efarmoges Etaireia Periori Smenis Efthynis (GRGreece).
Consortium
The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Adamant Aerodiastimikes Efarmoges Etaireia Periori Smenis Efthynis | GRGreece | Coordinator | Not stated | exact name (0.95) |
| Ebos Technologies Limited | CYCyprus | Participant | Not stated | known name (1.00) |
| Ecliptic Defence and Space Ltd | CYCyprus | Participant | Not stated | known name (0.95) |
| Pleione Energy GmbH | DEGermany | Participant | Not stated | known name (1.00) |
| Iquadrat Informatica SL | ESSpain | Participant | Not stated | known name (1.00) |
| Eurecom Gie | FRFrance | Participant | Not stated | known name (1.00) |
| Athina-Erevnitiko Kentro Kainotomias Stis Technologies Tis Pliroforias, Ton Epikoinonion Kai Tis Gnosis | GRGreece | Participant | Not stated | exact name (0.95) |
How the participants were read
The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.
Read on from 2 pages.
What the checks removed or corrected for this factsheet:
- 1: recovered
- 1: names the model returned that are not in the factsheet text (dropped)
- 1: table rows the model left out
Changes of the consortium
First seen on with 6 participants from 5 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
EDF project factsheet (opens in new tab)
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.The participants were read from the project factsheet by a language model (see "How the participants were read" below).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.