FIRES 2
Future Indirect fiRes European Solution 2
- Programme
- European Defence Fund
- Call year
- 2023
- Duration
- 36 months
- Total cost
- EUR 32,277,252
- EU contribution
- EUR 26,900,616
- Participants
- 21 from 13 countries
- Topic
- EDF-2023-DA-GROUND-IFS
Coordinated by Nexter Munitions S.A. (FRFrance).
Consortium
The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Nexter Munitions S.A. | FRFrance | Coordinator | Not stated | known name (0.95) |
| Mecar S.A. | BEBelgium | Participant | Not stated | exact name (0.95) |
| Institut Po Otbrana | BGBulgaria | Participant | Not stated | known name (1.00) |
| Additess Advanced Integrated Technology Solutions & Services Ltd | CYCyprus | Participant | Not stated | known name (1.00) |
| Esc Defence S.R.O. | CZCzechia | Participant | Not stated | known name (0.95) |
| Bayern-Chemie Gesellschaft Fur Flugchemische Antriebe Mitbeschrankter Haftung | DEGermany | Participant | Not stated | exact name (0.95) |
| Escribano Mechanical and Engineering S.L.U. | ESSpain | Participant | Not stated | known name (1.00) |
| Gmv Aerospace and Defence S.A. | ESSpain | Participant | Not stated | known name (0.95) |
| Instalaza S.A. | ESSpain | Participant | Not stated | known name (0.95) |
| Tecnobit SL | ESSpain | Participant | Not stated | known name (1.00) |
| Bittium Wireless OY | FIFinland | Participant | Not stated | known name (1.00) |
| Mbda France Sas | FRFrance | Participant | Not stated | known name (1.00) |
| Roxel France | FRFrance | Participant | Not stated | exact name (0.95) |
| Thales Las France Sas | FRFrance | Participant | Not stated | known name (1.00) |
| Simmel Difesa SpA | ITItaly | Participant | Not stated | known name (0.95) |
| Elsis pro Uab | LTLithuania | Participant | Not stated | known name (0.95) |
| Forsvarets Forskninginstitutt | NONorway | Participant | Not stated | known name (1.00) |
| Nammo Raufoss As | NONorway | Participant | Not stated | known name (1.00) |
| Sintef Manufacturing As | NONorway | Participant | Not stated | known name (1.00) |
| Optimal Structural Solutions Lda | PTPortugal | Participant | Not stated | known name (1.00) |
| Bae Systems Bofors AB | SESweden | Participant | Not stated | known name (0.95) |
How the participants were read
The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.
Read on from 3 pages.
The checks removed or corrected nothing for this factsheet.
Changes of the consortium
First seen on with 21 participants from 13 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
EDF project factsheet (opens in new tab)
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.The participants were read from the project factsheet by a language model (see "How the participants were read" below).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.