EDFC4ISR
OPTIMAS
OPTIcal MilitAry Secure communications
- Programme
- European Defence Fund
- Call year
- 2023
- Duration
- 36 months
- Total cost
- EUR 21,948,034
- EU contribution
- EUR 16,949,331
- Participants
- 12 from 7 countries
- Topic
- EDF-2023-DA-C4ISR-LCOM
Coordinated by Navantia S.A. (ESSpain).
Consortium
The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Navantia S.A. | ESSpain | Coordinator | Not stated | known name (1.00) |
| Schiebel Elektronische Gerate GmbH | ATAustria | Participant | Not stated | known name (1.00) |
| Reflex Aerospace GmbH | DEGermany | Participant | Not stated | exact name (0.95) |
| Consorcio Para El Diseno, Construccion, Equipamiento y Explotacion del Centro de Laseres Pulsados Ultracortos Ultraintensos | ESSpain | Participant | Not stated | known name (0.97) |
| Das Photonics SL | ESSpain | Participant | Not stated | known name (1.00) |
| Instituto de Astrofisica de Canarias | ESSpain | Participant | Not stated | known name (0.95) |
| Sener Aeroespacial Sociedad Anonima | ESSpain | Participant | Not stated | known name (1.00) |
| Universidad de Vigo | ESSpain | Participant | Not stated | known name (0.95) |
| Cailabs | FRFrance | Participant | Not stated | known name (1.00) |
| Mbryonics Limited | IEIreland | Participant | Not stated | known name (1.00) |
| Odysseus Space SA | LULuxembourg | Participant | Not stated | known name (0.95) |
| Gmvis Skysoft SA | PTPortugal | Participant | Not stated | known name (1.00) |
How the participants were read
The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.
Read on from 2 pages.
The checks removed or corrected nothing for this factsheet.
Changes of the consortium
First seen on with 12 participants from 7 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
EDF project factsheet (opens in new tab)
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.The participants were read from the project factsheet by a language model (see "How the participants were read" below).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.