EDFNAVAL
NEREUS
Naval systEm of systems and integRatEd sUrvivability of future EU platformS
- Programme
- European Defence Fund
- Call year
- 2024
- Duration
- 42 months
- Total cost
- EUR 64,553,115
- EU contribution
- EUR 45,000,000
- Participants
- 24 from 14 countries
- Topic
- EDF-2024-DA-NAVAL-FNP
- Grant agreement
- 101224749
Coordinated by Navantia S.A. (ESSpain).
Consortium
The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Navantia S.A. | ESSpain | Coordinator | Not stated | known name (1.00) |
| Dotocean | BEBelgium | Participant | Not stated | known name (0.95) |
| Shipyards and Maritime Equipment Association of Europe | BEBelgium | Participant | Not stated | known name (1.00) |
| Cy.r.i.c Cyprus Research and Innovation Center Ltd | CYCyprus | Participant | Not stated | known name (1.00) |
| Esg Elektroniksystem und Logistik GmbH | DEGermany | Participant | Not stated | known name (0.95) |
| Thyssenkrupp Marine Systems GmbH | DEGermany | Participant | Not stated | known name (1.00) |
| Terma As | DKDenmark | Participant | Not stated | known name (1.00) |
| Cafa Tech Ou | EEEstonia | Participant | Not stated | known name (1.00) |
| Indra Sistemas SA | ESSpain | Participant | Not stated | known name (1.00) |
| Mbda France Sas | FRFrance | Participant | Not stated | known name (1.00) |
| Naval Group | FRFrance | Participant | Not stated | known name (0.95) |
| Etme Peppas & Associates Societe Anonyme | GRGreece | Participant | Not stated | known name (0.95) |
| Isd Lyseis Olokriromenon Systimatonanonymos Etaireia | GRGreece | Participant | Not stated | known name (1.00) |
| Fincantieri SpA | ITItaly | Participant | Not stated | known name (1.00) |
| Leonardo - Societa Per Azioni | ITItaly | Participant | Not stated | known name (0.95) |
| Baltijos Pazangiu Technologiju Institutas | LTLithuania | Participant | Not stated | known name (1.00) |
| Damen Schelde Naval Shipbuilding BV | NLNetherlands | Participant | Not stated | known name (1.00) |
| Nederlandse Organisatie Voor Toegepast Natuurwetenschappelijk Onderzoek Tno | NLNetherlands | Participant | Not stated | known name (0.95) |
| Thales Nederland BV | NLNetherlands | Participant | Not stated | known name (1.00) |
| Kongsberg Defence & Aerospace As | NONorway | Participant | Not stated | known name (1.00) |
| Sintef As | NONorway | Participant | Not stated | known name (0.95) |
| Blue Insight Technologies, Unipessoal Lda | PTPortugal | Participant | Not stated | exact name (0.95) |
| Tekever Uas, S.A. | PTPortugal | Participant | Not stated | exact name (0.95) |
| Saab Kockums Aktiebolag | SESweden | Participant | Not stated | known name (1.00) |
How the participants were read
The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.
Read on from 3 pages.
What the checks removed or corrected for this factsheet:
- 1: recovered
- 1: names the model returned that are not in the factsheet text (dropped)
- 1: table rows the model left out
Changes of the consortium
First seen on with 23 participants from 14 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
EDF project factsheet (opens in new tab)
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.The participants were read from the project factsheet by a language model (see "How the participants were read" below).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.