Skip to content

EDFSMERO

ARRAYS

Advanced European RF Components for Wideband Array-Type Radar, Electronic Warfare and Communication Systems

Programme
European Defence Fund
Call year
2024
Duration
48 months
Total cost
EUR 3,999,983
EU contribution
EUR 3,999,976
Participants
3 from 3 countries
Topic
EDF-2024-LS-RA-SMERO-NT
Grant agreement
101224636

Coordinated by Baltijos Pazangiu Technologiju Institutas (LTLithuania).

Consortium

The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.

Members of the consortium
OrganisationCountryRoleEU contributionRecognised by
Baltijos Pazangiu Technologiju InstitutasLTLithuaniaCoordinatorNot statedknown name (1.00)
Commissariat a L Energie Atomique et Aux Energies AlternativesFRFranceParticipantNot statedknown name (0.95)
Xysensing Spolka z Ograniczona OdpowiedzialnosciaPLPolandParticipantNot statedknown name (0.95)

How the participants were read

The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.

Read on from 2 pages.

The checks removed or corrected nothing for this factsheet.

Changes of the consortium

First seen on with 3 participants from 3 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

EDF project factsheet (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.