Skip to content

EDFUWW

ASTERION

Adaptive and Secure Technology-Enabling Reliable and Integrated Opto-acoustic underwater Networking

Programme
European Defence Fund
Call year
2024
Duration
36 months
Total cost
EUR 23,245,022
EU contribution
EUR 23,245,022
Participants
19 from 9 countries
Topic
EDF-2024-RA-UWW-SACOM-STEP
Grant agreement
101223924

Coordinated by Nederlandse Organisatie Voor Toegepast Natuurwetenschappelijk Onderzoek Tno (NLNetherlands).

Consortium

The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Nederlandse Organisatie Voor Toegepast Natuurwetenschappelijk Onderzoek TnoNLNetherlandsCoordinatorNot statedknown name (0.95)
DotoceanBEBelgiumParticipantNot statedknown name (0.95)
Wiser Technology Solutions EoodBGBulgariaParticipantNot statedexact name (0.95)
Atlas Elektronik GmbHDEGermanyParticipantNot statedknown name (1.00)
Evologics GmbHDEGermanyParticipantNot statedknown name (1.00)
Infodas Gesellschaft Fur Systementwicklung und Informationsverarbeitung MbhDEGermanyParticipantNot statedknown name (1.00)
Teknologian Tutkimuskeskus Vtt OYFIFinlandParticipantNot statedknown name (0.95)
Commissariat a L Energie Atomique et Aux Energies AlternativesFRFranceParticipantNot statedknown name (0.95)
Naval GroupFRFranceParticipantNot statedknown name (0.95)
Sercel SasFRFranceParticipantNot statedexact name (0.95)
Thales Dms France SasFRFranceParticipantNot statedknown name (1.00)
Fincantieri SpAITItalyParticipantNot statedknown name (1.00)
Wsense SRLITItalyParticipantNot statedknown name (1.00)
Forsvarets ForskninginstituttNONorwayParticipantNot statedknown name (1.00)
Kongsberg Discovery AsNONorwayParticipantNot statedknown name (1.00)
Sintef AsNONorwayParticipantNot statedknown name (0.95)
Kungliga Tekniska HoegskolanSESwedenParticipantNot statedknown name (1.00)
Saab Dynamics AktiebolagSESwedenParticipantNot statedknown name (0.95)
Totalforsvarets ForskningsinstitutSESwedenParticipantNot statedknown name (1.00)

How the participants were read

The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.

Read on from 3 pages.

The checks removed or corrected nothing for this factsheet.

Changes of the consortium

First seen on with 19 participants from 9 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

EDF project factsheet (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.