EDFENERENV
SHARP
Sovereign High-performance Architecture for Rotorcraft Propulsion
- Programme
- European Defence Fund
- Call year
- 2025
- Duration
- 27 months
- Total cost
- EUR 24,998,579
- EU contribution
- EUR 24,998,579
- Participants
- 20 from 12 countries
- Topic
- EDF-2025-RA-ENERENV-PSR
- Grant agreement
- 101300447
Coordinated by Eura Sas (FRFrance).
Consortium
The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Eura Sas | FRFrance | Coordinator | Not stated | exact name (0.95) |
| Advanced Drivetrain Technologies GmbH | ATAustria | Participant | Not stated | known name (1.00) |
| Global Design Technology | BEBelgium | Participant | Not stated | known name (1.00) |
| Deutsches Zentrum Fur Luft - Und Raumfahrt Ev | DEGermany | Participant | Not stated | known name (0.97) |
| Fraunhofer Gesellschaft Zur Forderung der Angewandten Forschung Ev | DEGermany | Participant | Not stated | known name (0.95) |
| Mtu Aero Engines GmbH | DEGermany | Participant | Not stated | known name (1.00) |
| Fundacion Tecnalia Research & Innovation | ESSpain | Participant | Not stated | known name (1.00) |
| Patria Aviation OY | FIFinland | Participant | Not stated | known name (0.95) |
| Numalis | FRFrance | Participant | Not stated | known name (0.95) |
| Officenational D'Etudes Etde Recherches Aerospatiales | FRFrance | Participant | Not stated | known name (0.95) |
| Safran Helicopter Engines | FRFrance | Participant | Not stated | known name (1.00) |
| Isd Lyseis Olokriromenon Systimatonanonymos Etaireia | GRGreece | Participant | Not stated | known name (1.00) |
| Ergon Research SRL | ITItaly | Participant | Not stated | known name (1.00) |
| Ge Avio SRL | ITItaly | Participant | Not stated | known name (1.00) |
| Politecnico di Torino | ITItaly | Participant | Not stated | known name (0.95) |
| Stichting Koninklijk Nederlands Lucht - En Ruimtevaartcentrum | NLNetherlands | Participant | Not stated | known name (1.00) |
| Politechnika Rzeszowska Im Ignacego Lukasiewicza Prz | PLPoland | Participant | Not stated | known name (0.97) |
| Politechnika Warszawska | PLPoland | Participant | Not stated | known name (0.97) |
| Institutul National de Cercetare-Dezvoltare Turbomotoare - Comoti | RORomania | Participant | Not stated | known name (1.00) |
| Gkn Aerospace Sweden AB | SESweden | Participant | Not stated | known name (1.00) |
How the participants were read
The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.
Read on from 3 pages.
The checks removed or corrected nothing for this factsheet.
Changes of the consortium
First seen on with 20 participants from 12 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
EDF project factsheet (opens in new tab)
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.The participants were read from the project factsheet by a language model (see "How the participants were read" below).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.