EDFGROUND
TALON
Tactical Affordable Loitering Ordnance and Nodes
- Programme
- European Defence Fund
- Call year
- 2025
- Duration
- 24 months
- Total cost
- EUR 12,266,875
- EU contribution
- EUR 9,796,488
- Participants
- 12 from 7 countries
- Topic
- EDF-2025-DA-SI-GROUND-DAMM
- Grant agreement
- 101304941
Coordinated by Elliniki Aeroporiki Viomichania Anonymi Etaireia (GRGreece).
Consortium
The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.
| Organisation | Country | Role | EU contribution | Recognised by |
|---|---|---|---|---|
| Elliniki Aeroporiki Viomichania Anonymi Etaireia | GRGreece | Coordinator | Not stated | known name (1.00) |
| Thales Belgium SA | BEBelgium | Participant | Not stated | known name (0.95) |
| Cellock Ltd | CYCyprus | Participant | Not stated | known name (1.00) |
| Swarmly Ltd | CYCyprus | Participant | Not stated | exact name (0.95) |
| Thales Hellas Monoprosopi Anonymi Etaireia Paragogis Emporias Kai Ypiresion Ilektronikou Exoplismou | GRGreece | Participant | Not stated | known name (1.00) |
| Alpha Consultants S.R.L. | ITItaly | Participant | Not stated | known name (1.00) |
| Engineering - Ingegneria Informatica SpA | ITItaly | Participant | Not stated | known name (1.00) |
| Rebel Alliance S.R.L. | ITItaly | Participant | Not stated | known name (0.95) |
| Thales Italia SpA | ITItaly | Participant | Not stated | known name (1.00) |
| Mb Ai Drone | LTLithuania | Participant | Not stated | exact name (0.95) |
| Integrasys Sarl | LULuxembourg | Participant | Not stated | known name (0.95) |
| Xysensing Spolka z Ograniczona Odpowiedzialnoscia | PLPoland | Participant | Not stated | known name (0.95) |
How the participants were read
The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.
Read on from 2 pages.
The checks removed or corrected nothing for this factsheet.
Changes of the consortium
First seen on with 12 participants from 7 countries.
A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.
EDF project factsheet (opens in new tab)
Where this comes from
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.The participants were read from the project factsheet by a language model (see "How the participants were read" below).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.