Skip to content

EDFSIMTRAIN

EVOLVE

European Vision for interOperable Live, Virtual, constructive Ecosystem

Programme
European Defence Fund
Call year
2025
Duration
36 months
Total cost
EUR 15,016,648
EU contribution
EUR 14,999,986
Participants
20 from 13 countries
Topic
EDF-2025-RA-SIMTRAIN-LVC-STEP
Grant agreement
101301032

Coordinated by Cs Group-France (FRFrance).

Consortium

The factsheet states no amount per participant. A participant who left the project is not listed; see the history below.

Members of the consortium, coordinator first
OrganisationCountryRoleEU contributionRecognised by
Cs Group-FranceFRFranceCoordinatorNot statedknown name (0.95)
Vysoke Uceni Technicke v BrneCZCzechiaParticipantNot statedknown name (0.95)
Aditerna GmbHDEGermanyParticipantNot statedknown name (0.95)
Airbus Defence and Space GmbHDEGermanyParticipantNot statedknown name (1.00)
Rheinmetall Electronics GmbHDEGermanyParticipantNot statedknown name (0.95)
Ifad Ts A/SDKDenmarkParticipantNot statedknown name (1.00)
Indra Sistemas SAESSpainParticipantNot statedknown name (1.00)
Tecnobit SLESSpainParticipantNot statedknown name (1.00)
Masa Group SAFRFranceParticipantNot statedknown name (1.00)
ThalesFRFranceParticipantNot statedknown name (1.00)
Terra Spatium Ae Proionton Kai Ypiresion Geopliroforikis Kai DiastimatosGRGreeceParticipantNot statedknown name (1.00)
Leonardo - Societa Per AzioniITItalyParticipantNot statedknown name (0.95)
Mbda Italia SpAITItalyParticipantNot statedknown name (1.00)
Baltijos Pazangiu Technologiju InstitutasLTLithuaniaParticipantNot statedknown name (1.00)
Stichting Koninklijk Nederlands Lucht - En RuimtevaartcentrumNLNetherlandsParticipantNot statedknown name (1.00)
Forsvarets ForskninginstituttNONorwayParticipantNot statedknown name (1.00)
Kongsberg Defence & Aerospace AsNONorwayParticipantNot statedknown name (1.00)
Instytut Techniczny Wojsk LotniczychPLPolandParticipantNot statedknown name (0.97)
Totalforsvarets ForskningsinstitutSESwedenParticipantNot statedknown name (1.00)
Guardiaris, Racunalniske Aplikacije in Simulacije D.O.OSISloveniaParticipantNot statedknown name (0.95)

How the participants were read

The participants were read from the factsheet by a language model. Every name was checked against the factsheet text; one that is not in it was dropped. Countries come from the factsheet's own table where it could be read without the model. The factsheet states no amount per participant.

Read on from 3 pages.

The checks removed or corrected nothing for this factsheet.

Changes of the consortium

First seen on with 20 participants from 13 countries.

A snapshot of each project's members is taken once a month; a change is recorded when a snapshot differs from the one before. A project with no change listed has had the same members since it was first observed.

EDF project factsheet (opens in new tab)

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.