FP7H2020HORIZONEDF
Nederlandse Organisatie voor Toegepast Natuurwetenschappelijk Onderzoek TNO
- Country
- NLNetherlands
- Defence projects
- 46
- Projects, all programmes
- 942
- As coordinator
- 127
- EU contribution (CORDIS)
- EUR 419,866,745
- Active
- 2007 to 2025
Projects
942 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| VRUITSIMPROVING THE SAFETY AND MOBILITY OF VULNERABLE ROAD USERS THROUGH ITS APPLICATIONS | FP7 | 2013 | Participant | Not stated |
| MANSYSMANufacturing decision and supply chain management SYStem for additive manufacturing | FP7 | 2013 | Participant | EUR 230,306 |
| PEASSSPiezoelectric Assisted Smart Satellite Structure | FP7 | 2013 | Coordinator | EUR 769,571 |
| JOULESJoint Operation for Ultra Low Emission Shipping | FP7 | 2013 | Participant | EUR 197,589 |
| SSL-erateAccelerate SSL Innovation for Europe | FP7 | 2013 | Coordinator | EUR 587,708 |
| CRYSTALCritical System Engineering Acceleration | FP7 | 2013 | Participant | EUR 709,540 |
| SUNSUSTAINABLE NANOTECHNOLOGIES | FP7 | 2013 | Participant | EUR 398,668 |
| ADDFACTORADvanced Digital technologies and virtual engineering for mini-Factories | FP7 | 2013 | Participant | EUR 569,135 |
| ENIGMAEnlightenment and Innovation, Ensured through Pre Commercial Procurement in Cities | FP7 | 2013 | Participant | EUR 106,335 |
| ELECTRAEuropean Liaison on Electricity Committed Towards long-term Research Activities for Smart Grids. | FP7 | 2013 | Participant | EUR 578,178 |
| LogiConLean Secure and Reliable Logistic Connectivity for SMEs | FP7 | 2013 | Participant | EUR 276,764 |
| RECLAIMReclamation of Gallium, Indium and Rare-Earth Elements from Photovoltaics, Solid-State Lighting and Electronics Waste | FP7 | 2013 | Coordinator | EUR 1,188,025 |
| STRESTHarmonized approach to stress tests for critical infrastructures against natural hazards | FP7 | 2013 | Participant | EUR 229,000 |
| SEA4KETSemiconductor Equipment Assessment for Key Enabling Technologies | FP7 | 2013 | Participant | EUR 107,092 |
| RANGE-ITDetection and multimodal presentation of indoor objects for visually impaired people | FP7 | 2013 | Participant | EUR 25,500 |
| ISITEPInter System Interoperability for Tetra-TetraPol Networks | FP7 | 2013 | Participant | EUR 211,269 |
| ECCSEL PP2European Carbon Dioxide Capture and Storage Laboratory Infrastructure - Preparatory Phase 2 | FP7 | 2013 | Participant | EUR 108,498 |
| NANOSOLUTIONSBiological Foundation for the Safety Classification of Engineered Nanomaterials (ENM): Systems Biology Approaches to Understand Interactions of ENM with Living Organisms and the Environment | FP7 | 2013 | Participant | EUR 244,895 |
| PERFORMANCEDevelopment of Personalised Food using Rapid Manufacturing for the Nutrition of elderly Consumers | FP7 | 2012 | Participant | EUR 566,574 |
| DEPLOYTECHLarge Deployable Technologies for Space | FP7 | 2012 | Participant | EUR 59,966 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.European Defence Fund participants are read from the project factsheets that DG DEFIS publishes, by a language model; every name is checked against the factsheet text and a name that is not in it is dropped. The factsheets state no amount per participant.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.