H2020FP7HORIZON
E-Redes - Distribuicao de Eletricidade SA
- Country
- PTPortugal
- Defence projects
- 0
- Projects, all programmes
- 29
- As coordinator
- 3
- EU contribution (CORDIS)
- EUR 13,194,024
- Active
- 2009 to 2024
Projects
29 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| INTELLIGENTINteroperable Tools for nEtwork-aware, Ledger-based Local energy sharIng and flexibility manaGEment leveraging user engagemeNT | HORIZON | 2024 | Participant | EUR 403,375 |
| XL-ConnectLarge scale system approach for advanced charging solutions | HORIZON | 2023 | Participant | EUR 737,500 |
| R2D2Reliability, Resilience and Defense technology for the griD | HORIZON | 2022 | Third party | Not stated |
| OneNetOne Network for Europe | H2020 | 2020 | Participant | EUR 1,057,700 |
| 5GaaS5G-as-a-Service | H2020 | 2020 | Participant | EUR 348,740 |
| EUniversalMARKET ENABLING INTERFACE TO UNLOCK FLEXIBILITY SOLUTIONS FOR COST-EFFECTIVE MANAGEMENT OF SMARTER DISTRIBUTION GRIDS | H2020 | 2020 | Coordinator | EUR 988,750 |
| INTERRFACETSO-DSO-Consumer INTERFACE aRchitecture to provide innovative grid services for an efficient power system | H2020 | 2019 | Participant | EUR 191,625 |
| InterConnectInteroperable Solutions Connecting Smart Homes, Buildings and Grids | H2020 | 2019 | Participant | EUR 991,638 |
| EU-SysFlexPan-European system with an efficient coordinated use of flexibilities for the integration of a large share of RES | H2020 | 2017 | Participant | EUR 561,750 |
| DOMINOESSmart Distribution Grid: a Market Driven Approach for the Next Generation of Advanced Operation Models and Services | H2020 | 2017 | Participant | EUR 366,250 |
| InteGridDemonstration of INTElligent grid technologies for renewables INTEgration and INTEractive consumer participation enabling INTEroperable market solutions and INTErconnected stakeholders | H2020 | 2017 | Coordinator | EUR 2,111,183 |
| TDX-ASSISTCoordination of Transmission and Distribution data eXchanges for renewables integration in the European marketplace through Advanced, Scalable and Secure ICT Systems and Tools | H2020 | 2017 | Participant | EUR 313,750 |
| Sharing CitiesSharing Cities | H2020 | 2016 | Participant | EUR 677,451 |
| IntEnSys4EUINTEGRATED ENERGY SYSTEM - A PATHWAY FOR EUROPE | H2020 | 2016 | Third party | Not stated |
| RESCCUERESCCUE - RESilience to cope with Climate Change in Urban arEas - a multisectorial approach focusing on water | H2020 | 2016 | Participant | EUR 136,314 |
| RESILENSRESILENS: Realising European ReSiliencE for CritIcaL INfraStructure | H2020 | 2015 | Participant | EUR 238,750 |
| UPGRIDReal proven solutions to enable active demand and distributed generation flexible integration, through a fully controllable LOW Voltage and medium voltage distribution grid | H2020 | 2015 | Participant | EUR 1,777,125 |
| SENSIBLEStorage-Enabled Sustainable Energy for Buildings and Communities | H2020 | 2015 | Third party | Not stated |
| SEGRIDSecurity for smart Electricity GRIDs | FP7 | 2014 | Participant | EUR 99,180 |
| INSMARTIntegrative Smart City Planning | FP7 | 2013 | Participant | Not stated |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.