FP7H2020HORIZONEDF
Airbus Operations Sas
- Country
- FRFrance
- Defence projects
- 1
- Projects, all programmes
- 131
- As coordinator
- 11
- EU contribution (CORDIS)
- EUR 185,368,872
- Active
- 2008 to 2025
Projects
131 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| ICE GENESISCreating the next generation of 3D simulation means for icing | H2020 | 2019 | Coordinator | EUR 1,112,517 |
| PJ01-W2 EADPJ01 Wave 2 Enhanced Arrivals and Departures | H2020 | 2019 | Third party | Not stated |
| SAFEMODEStrengthening synergies between Aviation and maritime in the area of human Factors towards achieving more Efficient and resilient MODE of transportation | H2020 | 2019 | Participant | EUR 130,750 |
| PJ13 - W2 ERICAEnable RPAS Insertion in Controlled Airspace | H2020 | 2019 | Third party | Not stated |
| VLD2-W2 STAIRSSurface Traffic Alerts Improve Runway Safety | H2020 | 2019 | Third party | Not stated |
| DIGITS-AUDemonstration of ATM Improvements Generated by Initial Trajectory Sharing - Airspace User Part | H2020 | 2018 | Coordinator | EUR 818,325 |
| AAL2Augmented Approaches to Land 2 | H2020 | 2018 | Third party | Not stated |
| MADELEINEMultidisciplinary ADjoint-based Enablers for LArge-scale INdustrial dEsign in aeronautics | H2020 | 2018 | Participant | EUR 301,613 |
| SASSafer Autonomous Systems | H2020 | 2018 | Partner | EUR 0 |
| MUSIC-haic3D MUltidisciplinary tools for the Simulation of In-flight iCing due to High Altitude Ice Crystals | H2020 | 2018 | Participant | EUR 188,371 |
| GrapheneCore2Graphene Flagship Core Project 2 | H2020 | 2018 | Third party | Not stated |
| JETSCREENJET Fuel SCREENing and Optimization | H2020 | 2017 | Participant | EUR 200,996 |
| ANIMAAviation Noise Impact Management through Novel Approaches | H2020 | 2017 | Participant | EUR 178,775 |
| ARTEMAircraft noise Reduction Technologies and related Environmental iMpact | H2020 | 2017 | Participant | EUR 309,015 |
| COMPOSELECTORMulti-scale Composite Material Selection Platform with a Seamless Integration of Material Models and Multidisciplinary Design Framework. | H2020 | 2017 | Participant | EUR 72,396 |
| PJ18 4DTM4D Trajectory Management | H2020 | 2016 | Third party | Not stated |
| PJ31 DIGITSInitial Trajectory Information Sharing | H2020 | 2016 | Third party | Not stated |
| TurboNoiseBBValidation of improved turbomachinery noise prediction models and development of novel design methods for fan stages with reduced broadband noise | H2020 | 2016 | Participant | EUR 621,428 |
| PJ14 EECNSEssential and Efficient Communication Navigation and Surveillance Integrated System | H2020 | 2016 | Third party | Not stated |
| PJ10 PROSAController Tools and Team Organisation for the Provision of Separation in Air Traffic Management | H2020 | 2016 | Third party | Not stated |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.European Defence Fund participants are read from the project factsheets that DG DEFIS publishes, by a language model; every name is checked against the factsheet text and a name that is not in it is dropped. The factsheets state no amount per participant.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.