FP7H2020HORIZONEDF
Airbus Operations Sas
- Country
- FRFrance
- Defence projects
- 1
- Projects, all programmes
- 131
- As coordinator
- 11
- EU contribution (CORDIS)
- EUR 185,368,872
- Active
- 2008 to 2025
Projects
131 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| PROXIMAProbabilistic real-time control of mixed-criticality multicore and manycore systems | FP7 | 2013 | Participant | EUR 207,672 |
| CAPPADOCIACoordination Action Pro “Production, Avionics, Design” on Cost-efficiency in Aeronautics | FP7 | 2013 | Participant | EUR 118,770 |
| ACROSSAdvanced Cockpit for Reduction Of StreSs and workload | FP7 | 2013 | Participant | EUR 1,347,631 |
| CRYSTALCritical System Engineering Acceleration | FP7 | 2013 | Participant | EUR 85,104 |
| HAICHigh Altitude Ice Crystals | FP7 | 2012 | Coordinator | EUR 789,646 |
| MAN4GENManual Operation for 4th Generation Airliners | FP7 | 2012 | Participant | EUR 28,570 |
| ITAKAInitiative Towards sustAinable Kerosene for Aviation | FP7 | 2012 | Participant | EUR 32,356 |
| EURO-MILSEURO-MILS:\nSecure European Virtualisation for Trustworthy Applications in Critical Domains | FP7 | 2012 | Participant | EUR 226,207 |
| LOCOMACHSLOw COst Manufacturing and Assembly of Composite and Hybrid Structures | FP7 | 2012 | Participant | EUR 176,650 |
| JERONIMOJEt noise of high bypass RatiO eNgine: Installation, advanced Modelling and mitigatiOn | FP7 | 2012 | Participant | EUR 468,945 |
| SARISTUSmart Intelligent Aircraft Structures | FP7 | 2011 | Participant | EUR 23,125 |
| WEZARDWeather hazards for aeronautics | FP7 | 2011 | Coordinator | EUR 60,466 |
| APARSENAlliance Permanent Access to the Records of Science in Europe Network | FP7 | 2011 | Participant | EUR 160,000 |
| MBATCombined Model-based Analysis and Testing of Embedded Systems | FP7 | 2011 | Participant | EUR 104,403 |
| AIRCRAFTFIREFire risks assessment and increase of passenger survivability | FP7 | 2011 | Participant | EUR 88,525 |
| COLTSCasting of Large Ti Structures | FP7 | 2010 | Participant | EUR 45,000 |
| PRIMAEPackaging of futuRe Integrated ModulAr Electronics | FP7 | 2010 | Participant | EUR 201,980 |
| AIM²Advanced In-flight Measurement Techniques 2 | FP7 | 2010 | Participant | EUR 48,407 |
| ELECTRICALNOVEL AERONAUTICAL MULTIFUNCTIONAL COMPOSITE STRUCTURES WITH BULK ELECTRICAL CONDUCTIVITY AND SELF-SENSING CAPABILITIES | FP7 | 2010 | Participant | EUR 52,537 |
| ALASCAAdvanced Lattice Structures for Composite Airframes | FP7 | 2010 | Participant | EUR 21,177 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
- European Defence Fund: project factsheets of the call resultsLast read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: European Commission, DG DEFIS, EDF results factsheets.European Defence Fund participants are read from the project factsheets that DG DEFIS publishes, by a language model; every name is checked against the factsheet text and a name that is not in it is dropped. The factsheets state no amount per participant.
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.