FP7H2020HORIZON
Gkn Aerospace Services Limited
- Country
- GBUnited Kingdom
- Defence projects
- 0
- Projects, all programmes
- 23
- As coordinator
- 10
- EU contribution (CORDIS)
- EUR 8,739,499
- Active
- 2009 to 2024
Projects
23 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| eVTOLUTIONEVTOL MULTI-FIDELITY HYBRID DESIGN AND OPTIMIZATION FOR LOW NOISE AND HIGH AERODYNAMIC PERFORMANCE | HORIZON | 2024 | Associated partner | EUR 0 |
| GAM-2020-ENGH2020-IBA-CS2-GAMS-2020-2021 | H2020 | 2020 | Third party | Not stated |
| Grade2XLApplication of Functionally Graded Materials to Extra-Large Structures | H2020 | 2020 | Participant | EUR 133,350 |
| SEaSiDESEaSiDE (Smart Electro-expulsive System for SAT Aircrafts De-Icing) | H2020 | 2017 | Participant | EUR 164,925 |
| ALFAAdvanced Laminar Flow tAilplane | H2020 | 2016 | Third party | Not stated |
| ImpNLFFDDesign, Manufacturing, Qualification and Assembly of an Improved NLF Wing Leading Edge and Upper Cover Flight Test Article | FP7 | 2014 | Coordinator | EUR 1,075,000 |
| ENG GAM 2018Engine ITD - GAM 2018 | H2020 | 2014 | Third party | Not stated |
| SANDITDesign and manufacture of a flight worthy intake system (scoop/NACA divergent intake) SCOOP AND NACA DIVERGENT INTAKE TRIAL (SANDIT) | FP7 | 2013 | Coordinator | EUR 350,122 |
| InAIPSInnovative aircraft ice protection system – sensing and modelling | FP7 | 2013 | Participant | EUR 54,687 |
| AFLONEXT2nd Generation Active Wing“ – Active Flow- Loads & Noise control on next generation wing | FP7 | 2013 | Participant | EUR 50,000 |
| IceCodeIcephobic Coatings - Development of test methods | FP7 | 2013 | Coordinator | EUR 174,000 |
| IN-LIGHTInnovative bifunctional aircraft window for lighting control to enhance passenger comfort | FP7 | 2012 | Participant | EUR 204,740 |
| HAICHigh Altitude Ice Crystals | FP7 | 2012 | Participant | EUR 260,646 |
| GBSSD(3)Ground Based Structural & Systems Demonstrator Phase 3 - Component and sub-system manufacture | FP7 | 2012 | Coordinator | EUR 1,448,175 |
| LOCOMACHSLOw COst Manufacturing and Assembly of Composite and Hybrid Structures | FP7 | 2012 | Participant | EUR 1,267,849 |
| SARISTUSmart Intelligent Aircraft Structures | FP7 | 2011 | Participant | EUR 255,529 |
| SIEDITDevelopment of a Slat with Integrated Electrical Deicers for Icing Wind Tunnel Tests | FP7 | 2011 | Coordinator | EUR 185,000 |
| GBSSD(2)Design & Manufacture of a ground based structural/systems demonstrator (Phase 2) | FP7 | 2010 | Coordinator | EUR 249,807 |
| SIPALDevelopment and Manufacture Scoop Intake and Channel incl. ice and debris protection and acoustic absorbers | FP7 | 2010 | Coordinator | EUR 214,881 |
| GKN GBSSDGround Based Structural/Systems Demonstrators | FP7 | 2010 | Coordinator | EUR 125,000 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.