Skip to content

FP7

Ecole Nationale Superieure des Techniques Industrielles et des Mines de Nantes

Country
FRFrance
Defence projects
0
Projects, all programmes
7
As coordinator
0
EU contribution (CORDIS)
EUR 642,375
Active
2009 to 2013

Partners

Partners are the organisations that were active in a project this organisation was active in. The shared projects shown are the most recent five.

83 partners in 26 countries

Partners, most shared projects first
OrganisationCountryShared projectsYearsLatest shared projects
Association Pour la Recherche et le Developpement des Methodes et Processus IndustrielsFRFrance42009 to 2013
Universite de LorraineFRFrance22009 to 2013
LinneuniversitetetSESweden22009 to 2013
Cardiff UniversityGBUnited Kingdom22009 to 2013
Radioactive Waste Repository AuthorityCZCzechia22009 to 2013
Arao-Agencija za Radioaktivne Odpadke Ljubljana ZavodSISlovenia22009 to 2013
Reseau Europeen Pour L Enseignement des Sciences NucleairesFRFrance22009 to 2013
Microbial Analytics Sweden ABSESweden22009 to 2013
Empresa Nacional de Residuos Radioactivos SAESSpain22009 to 2013
Posiva OYFIFinland22009 to 2013
University of StuttgartDEGermany22009 to 2012
Athens Technology Center Anonymi Viomichaniki Emporiki Kai Techniki Etaireia Efarmogon Ypsilis TechnologiasGRGreece22012
Budapesti Muszaki Es Gazdasagtudomanyi EgyetemHUHungary12013
Universidad Politecnica de MadridESSpain12013
Technische Universiteit DelftNLNetherlands12013
University of YorkGBUnited Kingdom12013
Universidad Autonoma de MadridESSpain12013
Universitatea Politehnica Din BucurestiRORomania12013
Aalto Korkeakoulusaatio SrFIFinland12013
Institut Mines-TelecomFRFrance12013

The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.

Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.