FP7H2020
Stiftelsen Sintef
- Country
- NONorway
- Defence projects
- 0
- Projects, all programmes
- 314
- As coordinator
- 51
- EU contribution (CORDIS)
- EUR 137,123,492
- Active
- 2007 to 2018
Projects
314 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| PlanetDataPlanetData | FP7 | 2010 | Participant | EUR 33,840 |
| CILECCTAA user-oriented, knowledge-based suite of Construction Industry LifE Cycle CosT Analysis (CILECCTA) software for pan-European determination and costing of sustainable project options | FP7 | 2009 | Participant | EUR 465,207 |
| EFFIPROEfficient and robust fuel cell with novel ceramic proton conducting electrolyte | FP7 | 2009 | Participant | EUR 371,925 |
| WALQINGWork and Life Quality in New and Growing Jobs | FP7 | 2009 | Participant | EUR 360,806 |
| NEXT-GTLInnovative Catalytic Technologies & Materials for Next Gas to Liquid Processes | FP7 | 2009 | Participant | EUR 435,500 |
| EMPOWERA SEMANTIC SERVICE-ORIENTED PRIVATE ADAPTATION LAYER ENABLING THE NEXT GENERATION, INTEROPERABLE AND EASY-TO-INTEGRATE SOFTWARE PRODUCTS OF EUROPEAN SOFTWARE SMES | FP7 | 2009 | Participant | EUR 7,000 |
| LORE-LCALow Resource consumption buildings and constructions by use of LCA in design and decision making | FP7 | 2009 | Coordinator | EUR 284,733 |
| AFOREForest biorefineries: Added-value from chemicals and polymers by new integrated separation, fractionation and upgrading technologies | FP7 | 2009 | Participant | EUR 302,186 |
| HISVESTAHIgh Stability VErtical SeparaTion Altimeter instruments | FP7 | 2009 | Coordinator | EUR 795,000 |
| CESARCost-Efficient Methods and Processes for Safety Relevant Embedded Systems | FP7 | 2009 | Participant | EUR 262,733 |
| PROMICROBEMicrobes as positive actors for more sustainable aquaculture | FP7 | 2009 | Participant | EUR 176,175 |
| ADABTSAutomatic Detection of Abnormal Behaviour and Threats in crowded Spaces | FP7 | 2009 | Participant | EUR 526,249 |
| TARGETTransformative, Adaptive, Responsive and enGaging EnvironmenT | FP7 | 2009 | Coordinator | EUR 1,367,540 |
| CRESCENDOCoordination action on Risks, Evolution of threatS and context assessment by an Enlarged Network for r&D rOadmap | FP7 | 2009 | Participant | EUR 25,411 |
| EQUITABLEEnabling universal and equitable access to healthcare for vulnerable people in poor resource settings | FP7 | 2009 | Participant | EUR 498,131 |
| SAFE@SEAProtective clothing for improved safety and performance in the fisheries | FP7 | 2009 | Coordinator | EUR 814,949 |
| NOTEREFIGANovel Temperature Regulating Fibres and Garments | FP7 | 2009 | Participant | EUR 279,507 |
| SMARTPMSmart Power Management in Home and Health | FP7 | 2009 | Participant | EUR 93,103 |
| JEMSIP_3DJoint Equipment and Materials for System-in-Package and 3D-Integration | FP7 | 2009 | Participant | EUR 106,880 |
| NANOMOFNanoporous Metal-Organic Frameworks for production | FP7 | 2009 | Participant | EUR 441,681 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.