FP7H2020
Elia System Operator
- Country
- BEBelgium
- Defence projects
- 0
- Projects, all programmes
- 14
- As coordinator
- 0
- EU contribution (CORDIS)
- EUR 1,654,575
- Active
- 2008 to 2018
Projects
14 projects, newest first
| Project | Programme | Year | Role | EU contribution |
|---|---|---|---|---|
| OSMOSEOptimal System-Mix Of flexibility Solutions for European electricity | H2020 | 2018 | Participant | EUR 465,588 |
| InnoDCInnovative tools for offshore wind and DC grids | H2020 | 2017 | Participant | EUR 122,009 |
| INCREASEINCREASING THE PENETRATION OF RENEWABLE ENERGY SOURCES IN THE DISTRIBUTION GRID BY DEVELOPING CONTROL STRATEGIES AND USING ANCILLARY SERVICES | FP7 | 2013 | Participant | EUR 11,100 |
| GARPURGenerally Accepted Reliability Principle with Uncertainty modelling and through probabilistic Risk assessment | FP7 | 2013 | Participant | EUR 226,317 |
| MEDOWMulti-terminal DC grid for offshore wind | FP7 | 2013 | Participant | EUR 244,707 |
| E-HIGHWAY2050Modular Development Plan of the Pan-European Transmission System 2050 | FP7 | 2012 | Participant | EUR 323,343 |
| ITESLAInnovative Tools for Electrical System Security within Large Areas | FP7 | 2012 | Participant | EUR 174,718 |
| ESTORAGESolution for cost-effective integration of renewable intermittent generation by demonstrating the feasibility of flexible large-scale energy storage with innovative market and grid control approach | FP7 | 2012 | Participant | Not stated |
| AFTERA Framework for electrical power sysTems vulnerability identification,dEfense and Restoration | FP7 | 2011 | Participant | EUR 50,957 |
| ECOGRID EULarge scale Smart Grids demonstration of real time market-based integration of DER and DR | FP7 | 2011 | Participant | Not stated |
| TWENTIESTransmission system operation with large penetration of Wind and other renewable Electricity sources in Networks by means of innovative Tools and Integrated Energy Solutions | FP7 | 2010 | Participant | Not stated |
| OPTIMATEAn Open Platform to Test Integration in new MArkeT DEsigns of massive intermittent energy sources dispersed in several regional power markets | FP7 | 2009 | Participant | Not stated |
| 7MW-WEC-BY-11Pilot Demonstration of Eleven 7MW-Class WEC at Estinnes in Belgium | FP7 | 2008 | Participant | Not stated |
| PEGASEPan European Grid Advanced Simulation and state Estimation | FP7 | 2008 | Participant | EUR 35,837 |
The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.
Where this comes from
- CORDIS: EU research projects (Horizon Europe, Horizon 2020, FP7)Last read on . Licence: Commission Decision 2011/833/EU (reuse of Commission documents). Source: CORDIS, European Commission.Participants and amounts as the Commission's CORDIS database states them (reuse under Commission Decision 2011/833/EU).
EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.
Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.
Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.