Skip to content

HORIZONH2020

Eaton Elektrotechnika Sro

Country
CZCzechia
Defence projects
0
Projects, all programmes
6
As coordinator
0
EU contribution (CORDIS)
EUR 3,984,521
Active
2020 to 2025

Projects

6 projects, newest first

Projects, newest first
ProjectProgrammeYearRoleEU contribution
EnlightennExt geNeration 1200V eLectric hIGH volTage powErtraiNHORIZON2025ParticipantEUR 732,375
HEROPSHydrogen-Electric Zero Emission Propulsion SystemHORIZON2024ParticipantEUR 1,499,400
NOVETROLNovel current control for climate neutral energy infrastructureHORIZON2024ParticipantEUR 801,250
MERITCentral Bohemia Mobility Programme for Excellence in Research, Innovation and TechnologyHORIZON2023Associated partnerEUR 0
LONGRUNDevelopment of efficient and environmental friendly LONG distance powertrain for heavy dUty trucks aNd coachesH20202020ParticipantEUR 372,027
HYPERRIDEHybrid Provision of Energy based on Reliability and Resiliency by Integration of Dc EquipmentH20202020ParticipantEUR 579,469

The country is the one the source records for the organisation’s registration (its PIC), and each profile says what it rests on. Where the record contradicts itself (the address in one country, the site name and the VAT number in another) we follow the two that agree: the Spanish research council CSIC is shown under Spain although its address is recorded in Italy. A body with sites in several countries is shown under the first of them in alphabetical order, and its profile lists the others. Beyond that we do not guess.

Where this comes from

EU contribution is the amount CORDIS's open data pays to the participant. For a participant with linked third parties it may include their share (the CORDIS page prints the net); an amount the data does not hold is left out, not counted as zero. EDF factsheets state none per participant, so EDF projects count as projects but add nothing to the amounts.

Organisation-level facts only: a name, a country, a role, an amount, a year. A participant is recognised by its PIC where the source gives one, otherwise by name; the page says which. How the data is built.

Names are as CORDIS and the EDF project factsheets publish them. We do not list an organisation whose name looks like a natural person’s. If this entry is you, or a business named after you, and you want it removed, write to the contact in the imprint; the privacy notice (sections 7 and 9) says how a request is handled.